Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the.2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25..R403.5.3Hot water.pipe.insulation . <br /> Insulation for'hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping inch (19:1 mm) and larger in.nominal diameter., <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold.. <br /> Piping located under a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blower door test shall be provided before CO: <br /> 26.A copy of-the enemy-cacls-shall be-with permit at all times. <br /> 27 Copy of final insulation-igoort-shall be provided ivith permit before fnab <br /> .28.1 No'fence, pool or screen enclosure -is issued with-thisbermit.` <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.=Right of Way. <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric_Code (2016) - <br />