My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22591
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 1:46:22 PM
Creation date
5/17/2021 11:44:28 AM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
20-22591
Building Department - Name
PAINTER,JERRY L & JEAN
Address
3410 MALACHITE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORMS <br /> TABLE R402A <br /> BUILDING COMPONENT PRESCRIPTIVE REQUIREMENTS' INSTALLED VALUES <br /> Climate Zone I Climate Zone 2 <br /> Windows U-Factor=NR U-Factor=0.40' U-Factor <br /> SHGC=0.25 SHGC=0.25 SHGC= <br /> Skylights U-factor=0.75 1.1-factor=0.65 U-factor <br /> SHGC=0.30 SHGC=0.30 SHGC= <br /> Doors:Exterior door U-factor=NR LLfactor=0.401 IJ-factor-- <br /> Floors: <br /> Slab-on-Grade NR NR <br /> Over unconditioned spaces' R-13 R-1 3 R-Value= <br /> Walls':Ext.and Adj. <br /> Frame R-13 R-1 3 R-Value= <br /> Mass <br /> Insulation on wall interior R-4 R-6 R-Value= <br /> Insulation on wall exterior R-3 R-4 R-Value= <br /> Ceilings' R=30 I R=38 R-Value= <br /> Air infiltration Blower door test is required on the building envelope to verify leakage<_I ACH; Total leakage=ACH <br /> test report provided to code official. Test re ort attached? <br /> Yes No El <br /> Air distribution systems: <br /> Air handling unit Not allowed in attic Location: <br /> Duct R-value R-value 2'R-8(supply in attics)or 2t R-6(ail other duct locations) P-Value <br /> Air leakages: <br /> Duct test Postconstruction test Total leakage<<4 cfm/1 00 s.f. <br /> Rough-in test Total leakage 4 cfm/1 00 s.f.(air handier installed) Total leakage cfm/1 OGs.f. <br /> Total leakage!�3 cfm/1 00 s.f.(air handier not installed Test report Attached? Yes No F1 <br /> Ducts in conditioned space Test not required if all ducts and AHU are in conditioned space Location: <br /> Air conditioning system: Minimum federal standard required by NAECAI: <br /> Central system 5 65,000 Btu/h SEER 14.0 <br /> Room unit or PTAC EER[from Table C403.2.3(3)] SEER <br /> Other: See Tables G403.2.3(1)-(1 1) SEE <br /> Heating system: Minimum federal standard required by NAECA6: <br /> Heat pump 65,000 Btu/h HSPF 8.2 HSPF= <br /> Gas furnace,non-weatherized AFUE80% AFUE= <br /> Oil furnace,non-weatherized AFUE83% AFUE= <br /> Other: <br /> Water heating system(storage type): Minimum federal standard required by NAECAI: <br /> Elentrie 40 gal:EF=0.92 Gallons= <br /> 50 gal:EF=0.90 EF= <br /> Gas fired' 40 gal:EF=0.59 Gallons= <br /> 50 gal:EF=0.58 EF= <br /> Other(describe): <br /> NR=No requirement. <br /> (1)Each component present in the As Proposed home must meet or exceed each of the applicable performance criteria in order to comply with this code using <br /> this method. <br /> (2)For impact rated fenestration complying with Section R301.2.1.2 of the Florida Building Code,Residential or Section 1609.L.2 of the Florida Building Code, <br /> Building, the maximum Wactor shall be 0.65 in Climate Zone 2. An area-weighted average of 17-factor and SHGC shall be accepted to meet the <br /> requirements, or up to 15 square Ceet of glazed fenestration area are exempted from the U-factor and SHGC requirement based on Sections R402.3.1, <br /> R402.3.2 and R402.3.3. <br /> (3)One side-hinged opaque door assembly up to 24 square feet is exempted from this U-factor requirement. <br /> (4)R-values are for insulation material only as applied in accordance with manufacturer's installation instructions. For mass walls, the -interior of wall" <br /> requirement must be tuet except if at least 50 percent of the insulation required for the"exterior of wall"is installed exterior of,or integral to,the wall. <br /> (5)Ducts&A RU installed"substantially leak-free"per Section R403.3.2.Test required by either individuals as defined in Section 553.993(5)or(7),Florida <br /> Statutes,or individuals licensed as set forth in Section 489.105(3)(t),(0 or(i),Florida Statutes.The total leakage test is not required for ducts and air <br /> handlers located entirely within the building thermal envelope. <br /> (6)Minimum efficiencies are these set by the National Appliance Energy Conservation Art of 1987 for typical residential equipment and are subject to NAECA <br /> rules and regulations. For other types of equipment. see Tables C403.2.3(1-1 1) of the Commercial Provisions of the Florida Building Code, Energy <br /> Conservation. <br /> (7)For other electric storage volumes,minimum EF=0.97-(0.00132*volume), <br /> (8)For other natural gas storage volumes,atininiurn EF=0.67-(0.0019*volume). <br /> R-56 FLORIDA BUILDING CODE—ENERGY CONSERVATION,6th EDITION(2017) <br />
The URL can be used to link to this page
Your browser does not support the video tag.