Laserfiche WebLink
Q <br /> • <br /> Plan .Rieview <br /> Modular Home Set-ups and Aluminum Packages <br /> 1)All property markers shall be exposed and clearly marked at time of first <br /> inspection. <br /> 2) All-setbacks shall be:met. <br /> 3)All garages shall comply with section 3.09:2 (Fire separation ): <br /> 4)-AC cess.shall be made available at time of inspection: <br /> 5) Ma'nufacture specification manual, approved plans and permit shall be available at: . <br /> time of'inspection. <br /> 6)No electric, plumbing, mechanical or framing is to be,covered without inspection and <br /> approval .fiat. <br /> 7) R.O.W. Use per-mit-required for driveways on public streets. <br /> 8)At least, 10' separation between other units in unplatted locations. <br /> -9)All work shall comply With the F.B.G; 6 '.edition and the 2014 N.E.C. <br /> 10) Clean.=outs shall be.installed per code. <br /> R.O.W. - Right Of Way F.B.C. - Florida Building Code <br /> N.E.C. - National Electric Code <br />