My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22643
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:28:44 PM
Creation date
5/17/2021 2:28:39 PM
Metadata
Fields
Template:
Building Department
Company Name
PEEPLES FAMILY CORP INC
Building Department - Doc Type
Permit
Permit #
20-22643
Building Department - Name
PEEPLES FAMILY CORP INC
Address
38345 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF GONTENTS <br /> 1O TPOZPVC '0 Roof ingSystem;Ovorwewo General Requirements <br /> 1 ' 1n,Considdrations&'Applicafion1 ' <br /> 1 Roofing <br /> Part 1: General <br /> 1.01 System Description 37 <br /> 1.02 Specification Designations 37 <br /> 1.03 Regulatory Requirements&Pre-job Conference 37 <br /> 1.04 Delivery,Storage&Protection 37 <br /> 1.05 Environmental Requirements&Restrictions 37 <br /> 1.06 Working Environment 38 <br /> 1.07 Safety Considerations&Warnings 38 <br /> Part 2: Products <br /> 2.01 Membrane 38 <br /> 2.02 Flashing-Wall&Curb 38 <br /> 2.03 Flashing Accessories 38 <br /> 2.04 Fasteners 39 <br /> 2.05 Adhesives,Sealants,Primers&Cleaners 39 <br /> 2.06 Traffic Protection 39 <br /> 2.07 Insulation 39 <br /> 2.08 High Traffic Applications 40 <br /> 2.09 Cover/Re-cover Boards 40 <br /> 2.10 Base Sheets 41 <br /> 2.11 Slip Sheet/Protection Layer 41 <br /> 2.12 Other Accessories 41 <br /> Part 3: Execution <br /> 3.01 Site Conditions 41 <br /> 3.02 Preparation of Roofing Area-New&Tear-off Applications 41 <br /> 3.03 Preparation of Roofing Area-Re-cover Applications 41 <br /> 3.04 Wood Nailer Installation 42 <br /> 3.05 Gypsum Board Installation 42 <br /> 3.06 Air/Vapor Retarder Installation 42 <br /> 3.07 Polymat Slip Sheet Installation 43 <br /> 3.08 Fire-Resistant Slip Sheet/Coating Installation 43 <br /> 3.09 Base Sheet 44 <br /> 3.10 Re-cover Board/Insulation Installation 44 <br /> 3.11 Membrane Installation 44 <br /> 3.12 Flashing Installation 49 <br /> 3.13 Traffic Protection 54 <br /> 3.14 Temporary Closures 55 <br /> 3.15 Field Quality Control 55 <br /> 3.16 Clean-up 55 <br /> 3.17 Maintenance 55 <br /> Note: Refer to www.gaf.com for a complete list of Product Data Sheets. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.