My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22643
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:28:44 PM
Creation date
5/17/2021 2:28:39 PM
Metadata
Fields
Template:
Building Department
Company Name
PEEPLES FAMILY CORP INC
Building Department - Doc Type
Permit
Permit #
20-22643
Building Department - Name
PEEPLES FAMILY CORP INC
Address
38345 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOF DESIGN <br /> Wood Planking —Insulation above the wood deck may be necessary to prevent <br /> —Min.1" (25 mm)nominal thickness. condensation from adversely affecting the roof. <br /> —Tongue&groove or splined edges required. —Insulation above the wood deck may be necessary to prevent <br /> —All boards must have a bearing on rafters at each end and be condensation from adversely affecting the deck. <br /> securely fastened. —Must meet minimum pull out values <br /> —Lumber should be kiln dried. —Minimum 5 test pulls per 1,000 sq.ft.(93 sq.m.) <br /> —Check compatibility of preservatives or fire retardants used to —Panels must be installed with a 1/8"to 1/4"(3 mm—6 mm) <br /> treat decking with roofing materials. gap between panels and must match vertically at joints to <br /> within 1/8" (3 mm). <br /> —Decking should be kept dry and roofed promptly after installation. —Moisture content not to exceed 16% <br /> —Decking should be kept dry and roofed promptly after <br /> installation. <br /> Plywood <br /> Note:OSB values vary greatly by manufacturer and with exposure <br /> —Min.15/32" (12 mm)thickness. to moisture.OSB exposed to daily condensation or nightly dew has <br /> —Deck must be attached with approved fasteners at required seen significant loss of pull out values.GAF will not accept any <br /> spacing. liability for substandard or moisture-damaged OSB. <br /> —Plywood sheathing must comply with roof deck design <br /> requirements and local codes for roof deck construction. Gypsum Concrete <br /> —The panels must be secured in accordance with APA- —Min.2" (51 mm)thickness. <br /> The Engineered Wood Association Construction Guide —Steel reinforcing mesh and permanent form boards required for <br /> recommendations.Tongue and groove edges or full blocking poured-in-place monolithic decks. <br /> required. <br /> —Plywood sheathing must be C-D Exposure 1 APA Rated, —Steel-reinforced edges required for pre-cast decking units. <br /> minimum 4 ply. —An average fastener withdrawal resistance as recommended <br /> —Plywood sheathing must comply with Structural 1 performance by the fastener manufacturer must be obtained.If proper <br /> rating. mechanical attachment cannot be achieved,please call 800- <br /> 766-3411 for assistance with installation recommendations. <br /> —Panels must be installed with a 1/8"to 1/4" (3 mm—6 mm) —If surface is either wet or frozen,a poured gypsum deck is not <br /> gap between panels and must match vertically at joints to <br /> suitable to receive a roof. <br /> within 1/8" (3 mm). <br /> —Moisture content not to exceed 16% <br /> —Decking should be kept dry and roofed promptly after Cementitious Wood Fiber <br /> installation. —Min.2"(51 mm)thickness. <br /> —Must be installed over joists not greater than 24" (610 mm) —Tongue and groove panel edges required. <br /> O.C. —Should not be installed over high humidity occupancies. <br /> —Insulation above the wood deck may be necessary to prevent —All structural wood fiber deck panels must be anchored against <br /> condensation from adversely affecting the deck uplift and lateral movement. <br /> —Must meet minimum pull out values <br /> —Minimum 5 test pulls per 1,000 sq.ft.(93 sq.m.) lightweight Insulating Concrete(LWIC) <br /> —Min.2" (51 mm)thickness. <br /> Oriented Strand Board(OSB) —Cellular lightweight insulating concrete decks can be installed <br /> —Min.15/32" (12 mm)thickness. over non-slotted,galvanized metal decking designed for cellular <br /> —Deck must be attached with approved fasteners at required lightweight insulating concrete or structural concrete. <br /> spacing.Consult local building codes for specific requirements. —Aggregate lightweight insulating concrete decks must be <br /> —OSB must comply with roof deck design requirements and local installed over permanent venting steel forms. <br /> codes for roof deck construction. —Insulating concrete installed over structural concrete or <br /> —The panels must be secured in accordance with APA- existing roof membrane substrates requires a GAF Field <br /> p Services Manager's or Director's approval. <br /> The Engineered Wood Association Construction Guide <br /> recommendations.Tongue and groove edges or full blocking —Lightweight insulating concrete decks are required to have a <br /> required. minimum compressive strength of 125 psi(9 kg/cm)and a <br /> density of 22 pcf(208 grams/cubic meter).Individual deck <br /> —OSB must comply with Structural 1 performance rating. manufacturers'standards apply when their specifications exceed <br /> —Oriented strand board(OSB)must be C-D Exposure 1 APA these GAF minimum thicknesses,compressive strengths,and <br /> Rated. density requirements. <br /> —Must be installed over joists not greater than 24" (610 mm) <br /> O.C. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.