My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22643
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:28:44 PM
Creation date
5/17/2021 2:28:39 PM
Metadata
Fields
Template:
Building Department
Company Name
PEEPLES FAMILY CORP INC
Building Department - Doc Type
Permit
Permit #
20-22643
Building Department - Name
PEEPLES FAMILY CORP INC
Address
38345 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 FT.(3.66 M)WIDE EVERGUARD®TPO MEMBRANE ATTACHMENT TABLE-MECHANICALLY ATTACHED OVER STEEL DECK <br /> Deck Type Minimum Fastener Type Plate Penetration Standard 90 psf <br /> Pull-out Values(ibs) Pattern Pattern' <br /> 750 Drill-Tec—SXHD 2-3/4"(70 mm) 12"(305 mm) 6"(152 mm) <br /> (#21) double barbed SXHD O.C. O.C. <br /> 2"(51 mm) <br /> Steel double barbed XHD 3/4"(19 min) <br /> 22 ga.(33 ksi) 450 Drill-Tec-XHD 2-3/8"(61 mm) through the deck 6"(152 mm) 6"(152 mm) <br /> (#15) barbed XHD O.C. O.C. <br /> Drill-Tec-Eye Hook® <br /> AccuSeam®Plate <br /> 750 Drill-Tec'"SXHD 2-3/4"(70 mm) <br /> (#21) double barbed SXHD 12"(305 mm) <br /> 2-3/4"(70 mm) O.C. <br /> double barbed SXHD <br /> Steel 2-3/8"(61 mm) 3/4"(19 mm) 6"(152 mm) <br /> 22 ga.(80 ksi) Drill-Tec—XHD barbed XHD through the deck O.C. <br /> 450 (#i5) 2"(51 mm) 6"(152 mm) <br /> double barbed XHD O.C. <br /> Drill-Tec'"Eye Hook® <br /> AccuSeam®Plate <br /> '90 psf(5.3 kPa)attachment pattern to provide 90 lbs per square foot of uplift resistance of the roof membrane to the deck Consult FM Approvals' <br /> RoofNav when a FM Approved assembly is required. <br /> PERIMETER HALF SHEET TABLE <br /> Number of EverGuard® Number of EverGuard® Number of EverGuard® <br /> Building Width Building Height TPO 60"(1.5 m) PVC 60"(1.5 m) TPO 72"(1.83 m) <br /> Half Sheets Half Sheets Half Sheets <br /> 0-34' 1 1 1 <br /> (0-10 m) <br /> <200' 35-100' 2 2 2 <br /> (61 m) (10-30 m) <br /> >100' Formula Calulations:Install half sheet throughout the perimeter and corner region. <br /> (30 m) The width of this region is defined as the least of the following two measurements: <br /> 0.1 x building width or 0.4 x building height. <br /> >_200' any height Note:The minimum perimeter width is 4'(1.2 m).The width is defined as the narrowest <br /> (61 m) dimension. <br /> Note:FM attachment requires the Formula calculation. <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.