Laserfiche WebLink
D 1 11 : ° ' 1 1 <br /> 1 ROOFING <br /> .O PVC <br /> materials when moisture,such as liquid water,dew,condensate, PVC roofing application should install these systems.Never <br /> snow or ice,is present on the roof deck or substrate to which the allow contact between the heated surface'of a hot welder or <br /> materials are to be applied. other tool and the applicator's hair,skin,or clothing.Always <br /> E.Material installation during periods of low ambient temperatures, wear protective gear,including but not limited to:hardhats,eye <br /> typically below 45OF(7.20C),can result in poor installation protection,heavy-duty gloves,and snug-fitting clothing. <br /> quality.To avoid these problems: C.Solvent-containing accessories may be combustible and should <br /> 1.Store accessory materials in a warming box. always be kept from heat,flame,or any source of ignition.Empty <br /> containers must be disposed of in posted toxic substance landfills <br /> 2.Use as soon as possible after removal from warming box. in accordance with local,state,and federal regulations. <br /> 3.Allow adhesives to properly cure. D.Thoroughly train all personnel in first-aid procedures,and <br /> 4.Adjust welder settings to ensure proper welds for applicable always comply with all OSHA safety standards and fire codes. <br /> ambient conditions. Also,use extreme caution when working around equipment, <br /> such as gas lines or HVAC units,which have electrical or <br /> gas connections. <br /> 1.06 Working Environment E.EverGuard®TPO or PVC roof membranes may be slippery <br /> A.Work should only begin when the contractor has decided to his/ when wet.Exercise caution when walking on the TPO or PVC <br /> her satisfaction that all specifications are workable as specified, membranes during or after a rain shower,or if moisture is <br /> and that the contractor can meet project and code requirements. present in the form of dew,frost or ice.Pay attention while <br /> walking on light-colored surfaces as ice or frost build-up may not <br /> B.The contractor should only begin roofing work when the be as visible as on a dark surface. <br /> substrate(s)have been prepared as necessary,and are ready to <br /> accept the roofing materials installed as specified. <br /> C.Provide a safe working environment,including,but not limited PART 2-PRODUCTS <br /> to,adequate fall protection,restriction of unauthorized access to 2.01 Membrane <br /> the work area,and protection of the building and its occupants. A.EverGuard®TPO <br /> D.Safe work practices should be followed,including,but not limited B.EverGuard Extreme®TPO <br /> to,keeping tools in good operating order;providing adequate <br /> ventilation if adhesives are used;and daily housekeeping to C.EverGuard®TPO FB Ultra <br /> remove debris and other hazards.See section 1.07 for further D.EverGuard Extreme®TPO FB Ultra <br /> details on safety. <br /> E.Protect the building,contents,surrounding area,building E.EverGuard°PVC <br /> occupants,and contractor personnel during work.Coordinate all F.EverGuard®PVC Fleece-back <br /> work operations with the building owner and building occupants G.EverGuard°PVC KEE <br /> so that adequate interior protection,as necessary,is provided and <br /> disruption to normal building operations is minimized. H.EverGuard®PVC KEE Fleece-back <br /> F.Where heavy wheeled or other traffic over the partially completed <br /> roofing is unavoidable,provide and use adequate plank or 2.02 Flashing-Wall&Curb <br /> plywood,set over a minimum thickness of rigid board insulation <br /> to protect the newly installed roof. A.EverGuardO membrane flashing should be of the same type and <br /> thickness as the roofing membrane.EverGuard Freedom—TPO <br /> G.Provide temporary water cut-offs and tie-ins at the end of each can be used with EverGuard®TPO membrane for flashing in the <br /> workday.Remove all temporary work at the beginning of the same thickness as the field membrane. <br /> next workday. <br /> B.The use of EverGuard Extreme TPO flashings is required on <br /> H.When tearing off an existing membrane,limit removal to the EverGuard Extreme°systems. <br /> area that will be completely reroofed that day with the new <br /> roofing system. C.Because colored TPO membranes may exhibit different welding <br /> characteristics,please call 800-766-3411 before attempting to <br /> I.If conditions are uncovered or created that would be detrimental weld different-colored TPO membranes with white membranes or <br /> to the proper execution of specified work,immediately notify the fleshings. <br /> building owner and the designer of record of these conditions for <br /> consultation on acceptable remedy or resolution of the problem. D.EverGuard®TPO and PVC Fleece-Back®embranes are optional <br /> flashing membranes for all EverGuard TPO and PVC roofing <br /> systems,respectively.These membranes may be a solution when <br /> 1.07 Safety Considerations&Warnings a contaminated substrate is encountered. <br /> A.As with any construction project,safety is a key element.All <br /> applicable safety standards and good roofing practices must 2.03 Flashing Accessories <br /> be followed.Read and understand GAF's Design&Application <br /> Guidelines before starting application.Follow all precautions A.EverGuardO preformed flashing accessories must be of the same <br /> and directions. type as the roofing membrane. <br /> B.Only properly trained and professionally equipped roofing <br /> contractors experienced in the installation of each TPO and <br /> 38 <br />