My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22648
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 2:31:35 PM
Creation date
5/17/2021 2:31:32 PM
Metadata
Fields
Template:
Building Department
Company Name
EQUITY TRUST COMPANY FBO ROSE
Building Department - Doc Type
Permit
Permit #
20-22648
Building Department - Name
EQUITY TRUST COMPANY FBO ROSE
Address
39243 7TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALAI <br /> WNEMOJetc. <br /> 5.9 Tile Slippage Limitations(FRSA/TRI April 2012(04-12)): <br /> When loading roof tiles on the underlayment in direct-deck tile assemblies,the maximum roof slope shall be as follows. These <br /> slope limitations can only be exceeded by using battens during loading of the roof tiles. <br /> TABLE 2: TILE SLIPPAGE LIMITATIONS FOR DIRECT-DECK TILE INSTALLATIONS <br /> Underlayment Tile Profile Staging Method Maximum Slope <br /> Elastoflex G TU Flat 10-tile stack 7:12 <br /> Lugged 8-tile stack(6 over 2) 6:12 <br /> Elastoflex S6 G or S6 G FR Flat or Lugged 6-tile stack(4 over 2) 4:12 <br /> HydraGuard Tile Pro Flat or Lugged 6-tile stack(4 over 2) 7:12 <br /> Polyflex G or G FR Flat or Lugged 6-tile stack(4 over 2) 4:12 <br /> Polyflex SA P or SA P FR Flat or Lugged 6-tile stack(4 over 2) 4:12 <br /> Polystick MTS Plus Flat 6-tile stack(4 over 2) 5:12 <br /> Lugged 6-tile stack(4 over 2) 4:12 <br /> Flat 6-tile stack(4 over 2)or 10-tile stack 7:12 <br /> Polystick TU Max Lugged 6-tile stack(4 over 2) 7:12 <br /> Lugged 10-tile stack 6:12 <br /> Polystick TU P Flat 6-tile stack(4 over 2) 6:12 <br /> Lugged 6-tile stack(4 over 2) 4:12 <br /> Polystick TU Plus Flat or Lugged 6-tile stack(4 over 2) 7:12 <br /> Flat or Lugged 10-tile stack 6:12 <br /> 6. INSTALLATION: <br /> 6.1 Polyglass Roof Underlayments shall be installed in accordance with Polyglass published installation requirements subject to the <br /> Limitations set forth in Section 5 herein and the specifics noted below. <br /> 6.2• 'Re-fasten any loose decking panels,and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust <br /> and debris prior to application,and prime the substrate(if applicable). <br /> 6.3 Elastobase,Elastobase P or Mule-Hide Nail Base: <br /> 6.3.1 Non-Tile Applications: <br /> Shall be installed in compliance with the codified requirements for ASTM D226,Type II underlayment in FBC Table 1507.1.1 for <br /> the type of prepared roof covering to be installed and Polyglass published requirements. <br /> Elastobase,Elastobase P or Mule-Hide Nail Base may be covered with a layer of Polystick, Polyflex SAP, Polyflex SA P FR, Mule- <br /> Hide SA-APP Cap Sheet or SA-APP Cap Sheet (FR), self-adhered, Elastoflex G TU, Elastoflex S6 G or Elastoflex S6 G FR in hot <br /> asphalt or Polyflex G or Polyflex G FR,torch applied. Roof cover limitations are those are those associated with the top-layer <br /> underlayment,as set forth in Table 1. <br /> 6.3.2 Tile Applications: <br /> Elastobase, Elastobase P or Mule-Hide Nail Base are limited to use as a mechanically attached base sheet in the "Two Ply <br /> System"from FRSA/TRI April 2012(04-12). Reference is made to Table 1 and Section 5.6.1 herein,coupled with FRSA/TRI April <br /> 2012(04-12)Installation Manual. <br /> MEMO ETC,LLC. Evaluation Report P12060.02.09-R25 <br /> Certificate of Authorization#32455 6TM EDITION(2017)FBC NON-HVH2 EVALUATION FL5259-1129 <br /> Polyglass Roof Underlayments;(954)233-1230 Revision 25:10/14/2019 <br /> Page 14 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.