Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25; R403:5.3Hof water pipe insulation <br /> Insulation for hot water. pipe With'a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3j. inch (19.1 mm) and larger in.nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a_distribution manifold:_ <br /> Piping:located under'a floor slab.. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A copy of the enerjzy cacls shall be:with-hermit at all times <br /> 27. Cope of final insulation report shall be provided with peen:it before fnab <br /> 28. No fence,pool or enelosure as issued with ahis hermit- <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />