Laserfiche WebLink
Bldg Dept <br /> From: Nathan Pettis <TN Pettis@ d rhorton.com> <br /> Sent: Friday,June 19,2020 2:08 PM <br /> To: Bldg Dept <br /> Cc: Alan L Beasley <br /> Subject: Abbott Park model CO <br /> EXTERNAL EMAIL <br /> cJl u� /X <br /> Jackie, <br /> Can we get a temporary CO if we have a generator for the mode l_center-8029 Sail CloueQ-2-2-562,We have all the <br /> necessary inspections called and passed except final which I understand we need power for. I had the blower door test <br /> done using a small generator for power and I have the insulation certificate. Duke energy has told us they are at best 3 <br /> weeks out and probably more for power to the community and we would like to open the model center now.We have <br /> done this in the past in other counties where we had a large generator running to power the entire house until <br /> permanent power was established. Please let me know what you need if this is possible. <br /> Thank you, <br /> NATHAN PETTIS <br /> SUPERINTENDENT o' <br /> r <br /> � t ` D.R.HORTON <br /> • 12602 Telecom Drive, G ` <br /> �'�%1!G!°lCA [lE�Al1f! o:813.740.9720 c:81 <br /> Home for every stage it y <br /> V <br /> ' f <br /> 1 <br />