Laserfiche WebLink
. 23:Tamper- Resistant Receptacles in accordance with 406.11 of the 201.61 N.E.0 <br /> 24. In accordance with the Land Development-Code,lots-shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hof.water pipe insulation <br /> Insulation for-.hot water pipe with.a minimum thermal resistance (R-value) of R-3 shall.tie applied to the <br /> followin <br /> Piping-V/ inch (1.9.1 mm) and larger in.nominaldiameter. <br /> Piping:serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from themater heater to a distribution manifold:. <br /> .Piping located under a floor Slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation'systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A copy ofthe enemy cacls-shall be with permit at all times <br /> -27. CopV of final insulation report shall be provided with permit before final <br /> 28. No fence, pool or. enclosure :is issued with This permit± <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />