My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22682
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 10:43:15 AM
Creation date
5/20/2021 10:43:13 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR LAKES
Building Department - Doc Type
Permit
Permit #
20-22682
Building Department - Name
DR HORTON
Address
7808 BROAD POINTE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017- AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> TABLE 402.4.1.1 <br /> AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA <br /> Project Name: Elston 2260 Eliav G Builder Name: DRH Express Homes <br /> Street: Permit Office: <br /> City,State,Zip: Zephyrhills,FL, Permit Number: <br /> lJ <br /> Owner: Jurisdiction: W <br /> Design Location: FL,Tampa <br /> COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA <br /> General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall <br /> The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. <br /> requirements Breaks or joints in the air barrier shall be sealed. <br /> The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit <br /> Ceiling/attic the insulation and any gaps in the air barrier shall be sealed. shall be aligned with the air barrier. <br /> Access openings,drop down stairs or knee wall doors to <br /> unconditioned attic spaces shall be sealed. <br /> Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls <br /> The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity <br /> sealed. with a material having a thermal resistance of R-3 <br /> Knee walls shall be sealed. per inch minimum. <br /> Exterior thermal envelope insulation for framed <br /> walls shall be installed in substantial contact and <br /> continuous alignment with the air barrier. <br /> Windows,skylights The space between window/door jambs and framing,and <br /> and doors skylights and framing shall be sealed. <br /> Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. <br /> Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to <br /> (including insulation. maintain permanent contact with the underside of <br /> above-garage subfloor decking,or floor framing cavity insulation <br /> and cantilevered shall be permitted to be in contact with the top side <br /> floors) of sheathing,or continuous insulation Installed on <br /> the underside of floor framing and extends from the <br /> bottom to the top of all perimeter floor framing <br /> members. <br /> Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation,insulation <br /> a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace <br /> Shafts,penetrations Duct shafts,utility penetrations,and flue shafts opening to <br /> exterior or unconditioned space shall be sealed. <br /> Batts in narrow cavities shall be cut to fit,or narrow <br /> Narrow cavities cavities shall be filled by insulation that on <br /> installation readily conforms to the available cavity <br /> spaces. <br /> Garage separation Air sealing shall be provided between the garage and conditioned spa c 3s. <br /> Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building <br /> shall be sealed to the drywall. thermal envelope shall be air tight and IC rated. <br /> Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring <br /> and plumbing in exterior walls,or insulation that on <br /> installation readily conforms to available space shall <br /> Pytpnd behind 12112ina and wiring. <br /> Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall <br /> on exterior wall tubs shall separate them from the showers and tubs. be insulated. <br /> Electrical/phone,box or The air barrier shall be installed behind electrical or communication <br /> exterior walls boxes or air-sealed boxes shall be installed. <br /> HVAC register boots HVAC register boots that penetrate building thermal envelope shall <br /> be sealed to the sub-floor or drywall. <br /> Concealed When required to be sealed,concealed fire sprinklers shall only be <br /> sprinklers sealed in a manner that is recommended by the manufacturer. <br /> Caulking or other adhesive sealants shall not be used to fill voids <br /> betw en fire-srid and walls or ceili <br /> In addition,inspection of log walls shall with the provisions of[CC-400. <br /> a be in <br /> 11/8/2019 10:17 AM EnergyGauge@ USA 6.0.02(Rev.1)-FlaRes2017 FBC 6th Edition(2017) Compliant Software Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.