Laserfiche WebLink
:3 <br /> 5 C9 <br /> C PORTABLE WAREHOUSES <br /> 0 =1 <br /> 100 DOUGLAS ST. VALDOSTA, GA 31,601 <br /> o uj 132 CENTRAL INDUSTRIAL ROW, PURVIS, MS 39475 <br /> 12 <br /> Z <br /> 1398 HWY 95 NORTH, BASTROP, TX 78602 <br /> 0 TIEDOWN PLANS <br /> LL <br /> ip lu Lu Luow STATE OF <br /> S d —1 z FLORIDA <br /> GENERAL IAL N > <br /> "V"4�4 T offM <br /> "L 0 <br /> 1. THE CO RESPONSIELU;j�EYING AL EXISTING CONDITIONS. <br /> 1 0 T <br /> 2. Tl_,:E CCC 4AfE RESPONSIP ATNG ARCHITECTURAL,STRUCTURAL,MECHANICAL,AND <br /> "N N, <br /> ELECT j I FA IMENSIONS.A91 R NCIES BETWEEN SUCH DETAILS AND DIMENSIONS SHALL BE REPORTED iw <br /> TO TH 0 PROCEEDING WITH THE WORK. Sheet Index <br /> 3, THE C BE RESPONSIBLE FOR ERECTION PROCEDURE AND SEQUENCE TO INSURE THE INTEGRITY OF THE 0 <br /> BUILDIINA I NfENT PARTS DURINGCONSTRUCTION, SHEET NUMBER SHEET TITLE <br /> 4. THESE PLANS HAVE BEEN PREPARED PER REGULATIONS OF THE 6TH EDITION,2017 FLORIDA BUILDING CODE.THE WORK OF <br /> ALL CONTRACTORS SHALL COMPLY WITH THE REQUIREMENTS SET FORTH ll�WITHOUT <br /> CODE NO DEVIATIONS TIEDOWN GENERAL <br /> - <br /> FROM THE WORK SHOWN OR REASONABLY IMPLIED SHALL BE UNDERTAKEN THOUT THE-ENGINILERS WRITTEN CONSENT- F-1 NOTES <br /> A COPY OF WHICH WILL BE FILED WITH THE CONSTRUCTION OFFICIAL. TIEDOWN SCHEDULE FOR <br /> 5. ANY CHANGES TO OR DEVIATIONS FROM THESE DRAWINGS SHALL NOT BE MADE WITHOUT WRITTEN CONSENT FROM THE F-2 EXPOSURE <br /> ENGINEER. o. <br /> 6. THESE DRAWINGS ARE THE PROPERTY OF THE ENGINEER AND SHALL NOT BE USED WITHOUT HIS CONSENT.DRAWINGS F-3 TIEDOWN SCHEDULE FOR <br /> LL <br /> EXPOSURE C', <br /> SHALL NOT BE USED FOR ISSUE OF BUILDING PERMIT UNLESS SIGNED AND SEALED BY THE ENGINEER, <br /> 7. THE OWNER AND THE CONTRACTOR SHALL HOLD HARMLESS THE ENGINEERIOROM'ANIJ'AGAINST ALL LIABILITY CLAIMS, F4 GROUND <br /> DAMAGES,LOSSES,AND EXPENSES INCLUDING LEGAL FEES ARISING;OUT OF,OR;RESULTING FROM ERRORS OR OMISSIONS IN ANCHOR SCHEDULE 'o <br /> THE PERFORMANCE OF THE WORK BY THE CONTRACTOR.THE DRAWINGS�SHOW,THE.GENERALARRANGEMENTS AND EXTENT <br /> OF THE WORK AS THE WORK PROGRESSES,THE OWNER AND THE CONTRACTbR,,-AT NO EXTRA'COSTS,SHALL MAKE THE F-5 TIEDOWN SECTIONS <br /> _w <br /> NS TO MAKE THE PARTS ALIGN.MODIFICATIONS I( OPTIONAL m <br /> 8. ALL WORK AND MATERIALS SHALL MEET THE REQUIREMENTS OF LOCAL AND STATE CODES AND THE SPECS OF THE F-6 <br /> PAD DETAILS w <br /> NATIONAL BOARD OF FIRE UNDERWRITERS.CONTRACTORS SHALL CHECK AND,VERIFYALL PLAN DIMENSIONS AND <br /> CONDITIONS BEFORE PROCEEDING WITH CONSTRUCTION.HE SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER FOR <br /> CORRECTION PRIOR TO BEGINNING ANY WORK.THE DISCOVERY OF DISCREPANCIES AFTER THE BEGINNING OF WORK WILL Engineer:Kent Bice <br /> BE EVIDENCE OF FAULTY WORK.AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.DO NOT SCALE DRAWINGS.ALL FL License M,50421 <br /> WRITTEN DIMENSIONS GOVERN. COA#30468 <br /> 9. THE M CONTRACTOR FOR THIS PROJECT SHALL INCLUDE ALL MATERIALS AND LABOR REQUIRED TO COMPLETE THE TOTAL . <br /> PROJECT.THE CONTRACTOR SHALL FURNISH AND PAY FOR ALL MATENIAL&TOOLS"EQUIP <br /> MENT,LABOR,MACHINERY, <br /> TRANSPORTATION,HEAT,WATER,UTILITIES,AND ALL OTHER FACILITIES AND SERVICES REQUIRED FOR THE SAFE AND <br /> Ile- <br /> PROPER EXECUTION AND COMPLETION OF THE WORK. <br /> 10. THE DOCUMENTS SHOW AN OVERVIEW OF THE WORK REQUIRED UNDER THIS,CONTRACTAND RELATED REQUIREMENTS AND No 60421 Or% 'z <br /> CONDITIONS THAT WILL IMPACT THE PROJECT.ALL DRAWINGS ARE+COMPLIMgN-fARil"T'HE,DRAWNGS GENERALLY SHOW THE <br /> INTENT OF THE OVERALL COMPLEXITY AND CONCEPTS OF THE P z.,R,OJECT,AND�DO NOT NECESSARILY SHOW ALL DETAILS AND <br /> CONDITIONS.ALL NEW INTERIOR CONCRETE SLABS AND FOUNDATION WALLS,ANPFOOTINGS-SHALL HAVE SOIL POISONING STATE OF ".AU <br /> UNDER NEW WORK AND SHALL BE INSTALLED BY A LICENSED CONTRAC A <br /> 11, ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL STATEAND DEPARTMENT OF AGRICULTURE,STRUCTURAL PEST ....... <br /> CONTROL DIVISION REGULATIONS,RULES DEFINITIONS AND REQUIREMENTS. !cc: <br /> 12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND MAINTAINING-ALL EXISTING SETBACKS,EASEMENTS,AND <br /> ANY DEED RESTRICTIONS. <br /> .13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CLEANUP AND SHALL INCLUDE THE SITE,AND THE BUILDING.THE 04112t1B <br /> ENTIRE PROJECT SHALL BE LEFT IN A NEW,CLEAN CONDITION. <br /> 14. TIEDOWNS SHOWN INCLUDING STRAP AND ANCHOR,AND BEARING PADS ARE BASED ON AN ALLOWABLE BEARING PRESSURE <br /> OF 2500 PSF.ANY SOIL CONDITIONS THAT MAY DIFFER FROM THIS MUST BE BROUGHTTO THE ATTENTION•Of THE ENGINEER. 1552 6TH ST.,WINTER-HAVEN,FL 33880 ti <br /> 15. THE CONTRACTOR IS RECOMMENDED TO USE A SOIL TEST PROBE TO DETERMINETHE SOIL CLASS.WHERE SUCH TESTIN&IS (863)865,6502 <br /> NOT CONDUCTED,IT IS RECOMMENDED TO USE A 60"GALVANIZED ANCHOR WITH STABILIZER PLATE. <br /> 16. CONCRETE PADS UNDER SKIDS ARE OPTIONAL AND SHALL BE LOCATED ON UNDISTURBED SOIL OR PROPERLY COMPACTED SHEET: <br /> FILL MATERIAL.COMPACTED SOIL SHALL BE TESTED TO A MINIMUM OF 95%PROCTOR IN ACCORDANCE WITH ASTM D1557.FILL GENERAL NOTES <br /> MATERIAL SHALL BE FREE OF VEGETATION AND FOREIGN MATERIAL. rr, 1 <br /> 17. FINISH GRADE SHALL BE SLOPED AWAY FROM THE FOUNDATION FOR DRAINAGE.PROVISIONS SHALL BE MADE TO PREVENT DATE: 04MOIll 8 FA <br /> SOIL EROSION UNDER THE PAD AND DIRECT WATER AWAY FROM IT. <br /> — <br /> SCALE:E:AS NOSED CHECKED C.ECK.D BY:K..j SHEET 1 OF 6 <br />