Laserfiche WebLink
For Use With Drawing Number <br /> Z5-10-01306 <br /> Strut Placement <br /> Door Height <br /> Section Number 6'-6"to T-0" T-6"to 8'-0" 8'-3"to 8'-9" 9'-0"to 10'-6" 10'-9"to 12'-3" 12'-6"to 14'-0" 14'-3"to 15'-9" 16-0"to 1T-6" 17-9"to 19'-3" 19'-6"to 20'-o" <br /> 12 N/A N/A N/A N/A N/A N/A N/A N/A N/A 1 at Detail A <br /> 11 N/A N/A N/A N/A N/A N/A N/A N/A 1 at Detail A 1 at Detail B <br /> 10 N/A N/A N/A N/A N/A N/A N/A 1 at Detail A 1 at Detail B 1 at Detail B <br /> 9 N/A N/A N/A N/A N/A N/A 1 at Detail A 1 at Detail B 1 at Detail B 1 at Detail B <br /> 8 N/A N/A N/A N/A N/A 1 at Detail A 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B <br /> 7 N/A N/A N/A N/A 1 at Detail A 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B <br /> 6 N/A N/A N/A 1 at Detail A 1 at Detail B i at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B <br /> rj N/A 1 at Detail A 1 at Detail A 1 at Detail B 1 at Detail B 1 at Detail B I at Detail B I at Detail B 1 at Detail B 1 at Detail B <br /> 4 1 at Detail A 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B l at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B <br /> 3 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B <br /> 2 1 at Detail A 1 at Detail A 1 at Detail A 1 at Detail A I at Detail A 1 at Detail A 1 at Detail A 1 at Detail A 1 at Detail A 1 at Detail A <br /> 1 1 at Detail B I at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B 1 at Detail B <br /> Push Nut Detail (use on all rollers) <br /> use 3/8"I.D.on bottom fixture roller stem <br /> use 7/16"I.D.on end hinge and top fixture roller stems <br /> Push nut:Slide roller into fixture and tap --- <br /> push nut onto roller stem using 1/2"socket <br /> — and hammer. Leave 1/8"to 1/4"space -.-- <br /> between push nut and fixture. <br /> TracA Bracket Spacing — _Track bracket spacing shown for doors up to four sections high.Additional C <br /> duuf cntnay be added for maximum door height depicted on line - — - <br /> drawing. Track brackets must be added(per track)for each section and _ <br /> na greaterthan the coiTesporTdit-sectionyheig -- <br /> line drawing for required quantities). — <br /> Strut Placement Concerning Windows <br /> Where a strut crosses a window,it is acceptable to move the strut from a <br /> position of"Strut above hinge"down to"Strut on top half of the hinge". <br /> Do Not B <br /> Exceed <br /> Strut Strut C 38" <br /> B 28" <br /> e A 1 10" A <br /> End Hinge End age +/-3"tolerance <br /> Strut above hinge Strut on top half of hinge page 3 of 6 <br />