Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R401'5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31:inch (19.1 mm) and larger in. nominal diameter.. <br /> Piping.serving more than one dwelling unit. <br /> Piping located outside the conditioned space.. <br /> Piping from the.water heater to a distribution manifold,, <br /> Piping:located under,a floor slab. <br /> Buried-in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower.door test shall be provided before C.Q: <br /> 26.A cony ofthe energy cacls shall be with permit at all times <br /> 2Z. Conti of final insulation report shaff be provided with Permit before fhaL <br /> 28 No fence,pool or screen enclosure :is issued with:thispermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />