Laserfiche WebLink
. 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N:E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hof water pipe insulation <br /> insulation for hot water. pipe with a minimum thermal-resistance (R-value) of R-3 shall be applied to the . <br /> following:: <br /> Piping V, inch (1,9.1 mm) and larger in.nominaI diameter. <br /> Piping,serving more than:one dwelling unit. <br /> Piping located.outside the conditioned space: <br /> Piping from the water heater to.a distribution manifold: <br /> Piping located under a floor slab'. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.-Blower door test shall be provided before C.O: <br /> 26.A copy ofthe enerzy cacls shall be with permit at all times <br /> 27. Copy of final insulation Yeport-shafl be provided with peroafbefoee fnaL <br /> 28. No fence, pool or enclosure :is issued with ahis permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />