My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22792
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22792
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:17:56 AM
Creation date
6/15/2021 10:17:54 AM
Metadata
Fields
Template:
Building Department
Company Name
DUKE ENERGY
Building Department - Doc Type
Permit
Permit #
20-22792
Building Department - Name
DUKE ENERGY
Address
MIS SEE DESCRIPTION SOUTH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYMBOLS: <br /> ® Work Area <br /> ■ Channelizing Device (See Index 102-600) <br /> [p Work Zone Sign Buffer <br /> Space 250' C B <br /> Flagger See <br /> � Lane Identification + Direction of Traffic Table 1 D <br /> BE <br /> A - ONE LANE <br /> PREPARED ROAD <br /> TO STOP AHEAD <br /> LP Work ArLP ea <br /> Device Spacing (See Table 1) <br /> ROAD ONE LANE gE � Tangent <br /> WORK ROAD PREPARED <br /> AHEAD AREAD TosroP Taper Length <br /> D 50' To 100' <br /> * =k May Be omitted if ROAD WORK AHEAD sign is installed upstream within ti <br /> A B C <br /> WITHOUT TEMPORARY RAISED RUMBLE STRIPS <br /> GENERAL NOTES: <br /> 1. Special Conditions may be required in accordance with these notes 4. When a side road intersects the highway within the TTC zone, place <br /> TABLE 1 <br /> and the following sheets: additional TTC devices in accordance with other applicable TCZ Indexes. DEVICE SPACING <br /> 5. The two channelizing devices directly in front of the work area may be <br /> A. Railroad Crossings: Maximum Spacing Maximum Spacing of <br /> a. If an active railroad crossingis located closer to the Work Area than omitted provided vehicles in the work area have high-intensity rotating, posted of Cones or flashing, oscillating, or strobe lights operating. Type I or Type !I <br /> the queue length plus 300 feet, extend the Buffer Space as shown on Speed Tubular Markers Barricades/Panels/Drums <br /> Sheet 3. 6. When Buffer Space cannot be attained due to geometric constraints, use <br /> b. If the queuing of vehicles across an active railroad crossing cannot be the greatest attainable length, not less than 200 ft, for posted speeds On a On a On a On a <br /> avoided, provide a uniformed traffic control officer or r at the greater than 25 mph. Taper Tangent Taper Tangent A <br /> highway-rail grade crossing to prevent vehicles from stooppinppin g within <br /> the highway-rail grade crossing, even if automatic train warning 25 20' 50' 20' 50' 200' <br /> devices are in place. 7. ROAD WORK AHEAD and the BE PREPARED TO STOP signs may be omitted if <br /> 30 20' 50, 20' 50' 200't conditions <br /> con ons are me : <br /> B. If the Work Area encroaches on the Centerline, use the Layout for all of the following35 20' S0' 20' S0' 200' <br /> Temporary Lane Shift to Shoulder on Sheet 3 only if the Existing <br /> Paved Shoulder width is sufficient to provide for an 11' lane A. Work operations are 60 minutes or less. 40 20' 50' 20' 50' 200' <br /> between the Work Area and the Edge of Existing Paved Shoulder. B. Speed limit is 45 mph or less. <br /> Reduce the posted speed when appropriate. C. There are no sight obstructions to vehicles approaching the work area for 45 1 20' 50' 20' 50' 350' _ <br /> a distance equal to the Buffer Space shown in Table 1. 50 20' 50' 20' 100' 500' <br /> 2. Temporary Raised Rumble Strips: D. Vehicles in the work area have high-intensity, rotating, flashing, oscillating, - <br /> or strobe lights operating. 55 20' 50' 20' 100' 2640' 1. <br /> A. Use when both of the following conditions are met concurrently: E. Volume and complexity of the roadway has been considered. 60 20' 50' 20' 100' 2640' 1. <br /> a. Existing Posted Speed is 55 mph or greater; F. If a railroad crossing is present, vehicles will not queue across rail tracks. 65 20' S0' 20' 100' 2640' ]. <br /> b. Work duration is greater than 60 minutes. G. AFADs are not in use. <br /> B. Use a consistent Strip color throughout the work zone. 70 20' 50' 20' 100' 12640'1 1. <br /> C. Place each Rumble Strip Set transversely across the lane at locations 8. See Index 102-600 for general TCZ requirements and additional information. <br /> h—Al,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.