My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21998
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 7:46:04 AM
Creation date
2/24/2022 7:46:04 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-21998
Building Department - Name
DUKE ENERGY
Address
MIS SEE DESCRIPTION 18TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ZEPHYRHILLS - BUILDING DEPARTMENT <br /> RIGHT-OF-WAY USE PERMIT 9 <br /> DATE:_9/18/19 PERMIT#: �C / D <br /> No construction under ground or above ground of any facility shall be accomplished on any City Rights of Way without written approval from the City Building <br /> Department. Any application for approval of construction operations on any City owned Rights of Way shall furnish a detailed drawing showing the complete <br /> scope of the proposed work in triplicate to the office of the Building Official for approval prior to the commencement of any work. A copy of this permit is to be <br /> kept readily available at the site of the work at all times. <br /> PARCEL ID#:_02-26-21-0080-OOA00-0110_CITY ROAD_181h Ave WO#33925687 <br /> LOCATION (Legal Description): <br /> Assessed in Section 02, Township 26 South, Range 21 East of Pasco County, Florida. <br /> 38426 181h Ave <br /> Permission is hereby granted to_Duke Energy of 4121 St. Lawrence Dr. New Port Richey, FL 34653 <br /> For the construction and maintenance of: <br /> Remove/Install Pole at(P2) and Aerial Maintenance/Avian at(P3), (P4) MOT Index#(603), (605) <br /> Subject to the following conditions: <br /> 1. The construction and maintenance of such utility shall not interfere with the property and rights of a prior occupant. <br /> 2. All work shall be done in keeping with the standards of the City Streets Department and under the supervision of the City Building Official,who <br /> will be notified at least one day prior to commencement of construction. <br /> 3. All materials and equipment shall be subject to inspection by the City Building Official. <br /> 4. During construction all safety regulations of the Department of Transportation shall be observed and the City shall be relieved of all responsibility <br /> from damage of any nature arising from this permit. Subject to the same terms and conditions,the permit holder may take such safety measures, <br /> including placing and display of caution signs, as it may deem necessary in conduct of construction and maintenance work hereunder. It is the <br /> responsibility of the permittee to <br /> 5. All private and all City property shall be restored to its original condition as far as practical in the opinion of the City Building Official. <br /> 6. All underground crossing installations shall be laid at such depth as may be specified by the City Building Official. <br /> 7. The sketch covering the details of this installation shall be made a part of this permit. This permit is granted with the understanding that the <br /> applicant has notified all other utility users in the area covered by the permit and takes full responsibility for any damage incurred by prior <br /> installations as a result of his operations in order that they may safe guard their interests. <br /> 8. It is expressly stipulated that this permit is a license for permissive use only and that the placing of facilities upon public property pursuant to this <br /> permit shall not operate to create or to vest any property right in said holder. <br /> 9. Whenever the City decides to further exploit the City Rights of Way, any or all said poles, wires, pipes, cables, or other facilities and <br /> appurtenances authorized hereunder, shall be immediately removed from said Rights of Way, or reset or relocated thereon as required by the <br /> City Building Official at the expense of the holder of this permit. <br /> 10. The holder shall save and keep the City harmless from any and all damages, claims, or injuries that may occur by reason of the construction, <br /> maintenance,and operation of said facility. <br /> 11. The holder shall complete the requested work within 180_days or this permit shall become null and void. In the event the work requested <br /> is not completed upon the expiration date of this permit,the City shall have the right to complete such work and to charge the holder of the permit <br /> for all costs incurred in completed said work. <br /> 12. The holder shall post a cash or surety bond with the City Manager in the sum of$ dollars to guarantee performance of the <br /> obligations herein, and to guarantee maintenance of the right-of-way described herein for a period of one (1)year following completion of the <br /> requested installation. In the event a surety bond is posted,the surety bond shall be made payable to the City and shall obligate the surety to <br /> hold the City harmless in the event the holder of this permit should fail to meet any of its obligations hereunder. The bond shall also indemnify <br /> the City for all court costs and reasonable attorney's fees in the event legal action is required to collect on said bond. <br /> SUBMITTED BY: <br /> (PERMITTEE)_M Echols <br /> Signature &Title"oohle—Permit Coordinator <br /> Address 4427 Pet Lane#101 Lutz, FL 33559 <br /> APPROVED BY: <br /> CITY OF ZEPHYRHIILLLS <br /> Utilities Supervisor ' //G��_ Date It 6-h p <br /> Public Works Date SIb0TtCJ If <br />
The URL can be used to link to this page
Your browser does not support the video tag.