My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-505
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 7:49:44 AM
Creation date
2/24/2022 7:49:43 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-505
Building Department - Name
DUKE ENERGY
Address
MIS SEE DESCRIPTION 5530 21ST ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYMBOLS: <br /> ® Work Area <br /> • Channelizing Device(See Index 102-600) <br /> [p Work Zone Sign Buffer <br /> Space 250' C B A <br /> LT' Flogger ee <br /> b Lane Identification+Direction of Traffic Table 1 D <br /> Pogo <br /> �r� vPEv.E1RE➢ ftp,�E VrDPK <br /> n T06tOP AHFAD gHEgO <br /> _-_--__--__----------------------- - -_-____----_-_-________--__--_-____ <br /> b rLP LP <br /> Work Area b <br /> PogD Tangent Device Spacing(See Table 1) <br /> 1E <br /> WOPK DlIENPE <br /> gxego R,ve<xD PRE <br /> TOsr7 Taper Length <br /> D 50'To 100' x May Be omitted if ROAD WORK AHEAD sign is installed upstream within the project limits. <br /> r <br /> A B C <br /> WITHOUT TEMPORARY RAISED RUMBLE STRIPS <br /> GENERAL NOTES: <br /> ].Special Conditions may be required in accordance with these notes 4.When a side intersects the highway within the TTC zone,place TABLE I <br /> and the following sheets: additional TTC de devices in accordance with other applicable TCZ Indexes. DEVICE SPACING <br /> 5.The two channelizing devices directly in front of the work area may be Maximum S Distance <br /> A.Railroad Crossings: pacing Maximum Spacing o1 <br /> omitted provided vehicles in the work area have high-intensity rotating. Between <br /> a.1f an active length <br /> plus <br /> crossing is located closer to the Wars Area than Posted o/Cones ke Type 1 or Type 11 Buffer <br /> the queue length plus 300 feet,extend the Buffer Space as shown on flashing,oscillatmg,or strobe lights operating. Speed Tubular Markers Barr/codes/Panels/Drums Signs Space <br /> Sheet 3. 6.When Buffer Space cannot be attained due to geometric constraints,use <br /> b.!/the queuing of vehicles across an active railroad crossing cannot be On a On a On a On a <br /> avoided,provide a uniformed traffic control officer or flagger at the the greatest attainable length,not less than 200/t,for posted speeds Ta er Tangent Ta <br /> highway-rall grade crossing to prevent vehicles from stopping within greater than 25 mph. per Tangent <br /> A B C D <br /> the highway-rail grade crossing,even if automatic train warning 25 20' 504 2D 50' 2001 200' 200'[250' <br /> 755' <br /> 7.ROAD WORK AHEAD andcon iti BE PREPARED TO STOP signs may be omitted if <br /> devices are in place. 30 20' 50' 20' 50' 200' 200' 200' 200' <br /> B.If the Work Area encroaches on the Centerline,use the Layout for all of the following conditions are met: <br /> Temporary Lane Shift to Shoulder on Sheet 3 only if the Existing 35 20' 50, 20' S0' 2001 200' 200' 250' <br /> Paved Shoulder width is sufficient to provide for an 11'lane A.Work operations are 60 minutes or less. 40 20' 50' 20' so, 200' 209 200' 305' <br /> between the Work Area and the Edge o1 Existing Paved Shoulder. B.Speed limit is 45 mph or less. <br /> Reduce the posted speed when appropriate. C.There are no sight obstructions to vehicles approaching the work area for 45 20' 5V 2D 50, 350' 350' 350' 360, <br /> a distance equal to the Buffer Space shown in Table 1. 50 29 50' 20' 100' SOD 500' 500' 425' <br /> 2.Temporary Raised Rumble Strips: O.Vehicles in the work area have high-intensity,rotating,flashing,oscillating, 55 2D 50' 20' 100' 264D ISOU ]000 49or strobe lights operating.A Use when both of the following conditions are met concurrently: E.Volume and complexity of the roadway has been considered. 60 2D 50 2D 100, 2640' 1500. 1000, 570' <br /> a. Existing Posted Speed is 55 mph or greater; F.If a railroad crossing is present,vehicles will not queue across rail[racks. 65 20' 50' 20' 100 2640' 1500' IOOO 500'1 645' <br /> b.Work duration is greater than 60 minutes. G.AFADs are not in use. <br /> B.Use a consistent Strip color throughout the work zone. 70 20' 50' 20' 10O' 2640' I500' 1000' 500'1 730' <br /> C.Place each Rumble Strip Set transversely across the lane at locations B.See Index 102-600 for general TCZ requirements and additional information. <br /> shown. 9.Automated Flogger Assistance Devices(AFADs)may be used In accordance <br /> Use Option 1 or Option 2 as shown on Sheet 2.Use only one option with <br /> D. Specifications Section 102,990 and the APL vendor drawings. <br /> throughout work zone. <br /> 3.Additional one-way control may be provided by the following means: CONDITIONS <br /> A Flag-carrying vehicle; <br /> WHERE ANY VEHICLE,EQUIPMENT, <br /> B.Official vehicle; <br /> C.Pilot vehicles; WORKERS OR THEIR ACTIVITIES <br /> D.Traffic signals. ENCROACH THE AREA BETWEEN <br /> When flaggers are the sole means o/one-way control,the Ilaggers THE CENTERLINE AND A LINE 2' <br /> OUTSIDE THE EDGE OF TRAVEL WAY. <br /> P, must be in sight of each other or in direct communication at all times. <br /> P, <br /> A <br /> R LAST pJ TWO-LANE, TWO-WAY, <br /> DESCRIPTION: FY 2020-21 IN <br /> SH <br /> EVISION EET <br /> FDOT <br /> 11101117 Ww STANDARD PLANS WORK WITHIN THE 'TRAVEL WAY 102-603 1 of 3 <br /> D_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.