Laserfiche WebLink
• Mid <br /> Ryman Roofing Inc. <br /> 5%fee for credit card processing. <br /> A Division of Ryman Construction,Inc. <br /> \� 36413 SR 54 Zephyrhills, Florida 33541 Proposal# <br /> `'` Phone(813)782-6094 Fax(813)788-6773 NO. <br /> 1-855-Go-Ryman (1-855-467-9626) • Lic.#CCC 1325505 Estimate 4002700 <br /> www.Ryman Roofing.com <br /> QZZ Serving all of;Central Florida Job# <br /> --Owner/Purchaser-Marko Jaakkola _ __- _ _ - Date: 7/28/20 <br /> Claim#, Insurance Company: <br /> Policy# <br /> Job Address: 5904 16th St City: Zephyrhills Zip: 33542 <br /> Mail to Address: E-Mail Address: <br /> Home #- 813-334-5499 Marko Cell #: 203-640-8186 Winifred Business #: <br /> 0✓ Complete tear off of existing Asphalt shingles Additional Notes/Special Concerns: Includes <br /> One laver included Install new GAF Timberline lifetime Ltd. dimensional <br /> 0✓ Secure all loose roof decking as needed according shingles <br /> to Florida Building Codes <br /> ❑✓ Roof dried in with Peel and stick <br /> Rhino roof U20 synthetic underlayment two layers <br /> ✓❑ Install new valley metal with galvanized metal required per code <br /> ❑✓ Install new 6 "drip edge color: White <br /> ✓❑ Install new lead boots <br /> Z Install all new general roof vents <br /> M Install new ZShingle Metal Tile Two sheets of plywood included <br /> Modified Butimen ❑TPO <br /> 0 Manufacturer (shingle, metal or tile) G7AF <br /> Manufacturer CrPo or Mod. Bitumen) <br /> Z Color:(Shingle,Metal orTile) <br /> Color:(TPOorMOD.Bitumen) Permit and scheduling of inspections <br /> 0✓ All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet 10 383.00 <br /> �✓ All materials, labor and permits furnished Base Price*$ <br /> [✓ Provide a 5 Vear labor warranty <br /> Additional Items: Peel and stick underlayment on entire roof$4IrE B- <br /> Payment Method: Check# Cash Financing Insurance Claim <br /> ❑ Credit Card# Exp. Date CC ID# <br /> Down Payment:$ Amount Financed:$ Approx. Monthly Payment:$ <br /> PaymentTerms: 35% down and balance upon completion <br /> Extras: <br /> *B se Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"above. cusromertnflar <br /> Deficient 1/2"plywood replaced at a cost of$65.00 per sheet in the roof field,which includes labor&materials.All other wood work/ad- <br /> dl tonal labor,such as,but not limited to,valley rebuilding, rafter replacement, 1x decking,etc.will be a rate of$5.00 per lineal foot plus the <br /> cost of materials. <br /> THIS BECOMES A BINDING CONTRACT UPON ACCEPTANCE OF PROPOSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> I ACCEPT THIS PROPOSAL AND HEREBY CERTIFY THAT I HAVE READ AND FULLY UNDERSTAND THE PROVISIONS OF THIS CONTRACT. <br /> Purchaser: Date: <br /> Purchaser: Estimator: Ed <br />