My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-674
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 10:00:19 AM
Creation date
2/24/2022 10:00:18 AM
Metadata
Fields
Template:
Building Department
Company Name
B&L LAND HOLDINGS LTD
Building Department - Doc Type
Permit
Permit #
20-674
Building Department - Name
B&L LAND HOLDINGS LTD
Address
5512 7TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWERIGAN i c �f dyRyfi'l�d11 ®®fin , Inco Mr." <br /> 5�'c <br /> g "` «li�y <br /> 5/o fee for credit card processing. <br /> A Division of Ryman Construction,Inc. <br /> �9 36413 SR 54•Zephyrhills, Florida 33541 Proposal# <br /> Phone(813)782-6094• Fax(813)788-6773 NO. <br /> 0 1-855-Go-Ryman (1-855-467-9626)- Lic.#CCC 1325505 Estimate# 002700 <br /> www.RymanRoofing.com <br /> Q'® Serving all of Central Florida Job# (e <br /> Owner/Purchaser:Mark Leasure Date: 8/7/20 <br /> claim#: InsuranceCompany: <br /> -- ----------- <br /> Job Address: 5512 7th Street City. Zephyrhills Zip: 33542 <br /> Mail to Address: E-Mail Address: <br /> -iome#: 813-782-4510 Cell M Business #: <br /> ❑✓ Complete tear off of existing TPO Additional Notes/Special Concerns: Includes <br /> Install new GAF Evergard 60 mil TPO membrane <br /> Q✓ Secure all loose roof decking as needed according roofing after removing existing TPO membrane <br /> to Florida Building Codes <br /> FV Roof dried in with Insulation and TPO Install tapered insulation system to divert water off <br /> roof as designed in photo attached <br /> 0✓ Install new valley metal with galvanized metal Install Densdeck 1/2" roof panels over taper system <br /> Q✓ Install new 6 drip edge color: Install new 6" eave metal around perimeter <br /> lv Install new lead boots <br /> FvJ Install all new general roof vents <br /> M Install new Shingle ❑Metal Tile Seal around and near power pole to prevent water <br /> Modified Butimen FTPO intrusion <br /> 0 Manufacturer (shingle, metal or tile) GAF Hidden wood damage to be repaired/replaced at <br /> Manufacturer (TPo or Mod.Bitumen) <br /> Color:(Shingle,MetalorTile) <br /> Rs/ additional charge as discussed <br /> Color:(TPOorMOD.Bitumen) White Permit and scheduling of inspections <br /> �✓ All roof related debris removed from job site,pick-up loose <br /> nails using commercial grade magnet <br /> Fv All materials,labor and permits fumished Base Price*$ 247245.00 <br /> 1`71 Provide a 5 year labor warranty <br /> Additional Items: <br /> I <br /> Payment Method: ❑Check# ❑Cash Financing Insurance Claim <br /> ] Credit Card# Exp.Date CC ID# <br /> Down Payment:$ Amount Financed:$ Approx.Monthly Payment:$ <br /> PaymentTerms: 35% down and balance upon completion <br /> Extras: <br /> `Base Price does NOT include any unforeseen costs as described below unless indicated in"Additional Items"above. customerrn;tlat <br /> `/ Deficient 1/2"plywood replaced at a cost of$85.00 per sheet in the roof field,which includes labor&materials.All other wood work/ad- <br /> 1 tonal labor,such as,but d to,valley rebuilding,rafter replacement, 1x decking,etc.will be a rate of$5.00 per lineal foot plus the <br /> post of materials. <br /> rHIS BECOMES A BINDI CON PON C EPTANCE OF PR POSAL.PURCHASER ACKNOWLEDGES RECEIPT OF A COPY OF THIS CONTRACT. <br /> ACCEPT THIS PROPO L AND E IF THAT I HAVE REA AND FULLY UNDERSTAND THE PROVISIONS OF THIS CONTRACT. <br /> 'urchaser: Date: <br /> 'urchaser: Estimator: Ed <br />
The URL can be used to link to this page
Your browser does not support the video tag.