Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.41 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot water pipe insulation <br /> Insulation for hot.water pipe with a minimum thermal eesistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping_31.inch (1.9.1 mm)and larger in;nominal diameter.. <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the conditioned,space:. <br /> Piping from the water heater to a distribution manifold:, <br /> Piping:located under a floor slab. <br /> B'uriied in piping, <br /> Supply and:return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be proviided,before C.O: <br /> 26. A co of the enemy:cacls-shall be:with permit at all times <br /> 27. Copu of fitial insulation report shall be provided with permit before fnab <br /> 28. No fence, pool or screen enclosure is issued with:this permit; <br /> F.F.E.-Finished Floor Elevation <br /> RB.C=Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric.Code (2016) <br />