Laserfiche WebLink
23, Tamper- Resistant Receptacles in accordance with 4.06.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot Water pipe insulation <br /> insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V.inch (19.1 mm)and larger in.nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C:O: <br /> 26.A copy o t the enemy cacls shall be with permit at all times <br /> 2Z Copu of final.insulation report shall,be provided with permit before fanaL <br /> 28. No fence, pool onscreen'enclosure .is issued with:this Permit,* <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code Oh Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />