Laserfiche WebLink
1 <br /> 23. Tamper-Resistant.Receptacles in accordance with 406.11 of the.2016 N.E.0 <br /> 24. In accordance'with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot waterpipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping.1. inch (1.9.1 mm)and larger in.nominal diameter.. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space., <br /> Piping from the Wbter'heater to.a distribution manifold, <br /> Piping located under'a floorslab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower,door test shall be provided before C.O. <br /> 26. A cony of the enerQy cacls shall be with permit at all times <br /> 27. Copy offnal.'insulation-report shaffbe provided with Permit before final <br /> 28. No fence, pool or screen enclosure :is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />