Laserfiche WebLink
i; <br /> • E. <br /> Emerald Pointe lot improvement approval cover letter <br /> You must display the green permit and city Bldg. permit <br /> (if applicable) so it can be viewed from street, prior to <br /> st6rting any project. <br /> • n, <br /> i^ <br /> Na�ne: �c gar c �,�4 Project#: 701 7_R <br /> Lod#: Address: 31762-` lkne--L s; • <br /> E. <br /> Yo have been approved for your lot improvement request by the Board of <br /> Di ectors. Please be sure to review your application copy to see if there are any <br /> noies and changes with this approval. <br /> Y <br /> If Any of the boxes are checked below you need to address these issues before <br /> proceeding with your project, or when your project is completed. <br /> G <br /> ( ) City building permit, always check with the city to see if a permit is necessary. <br /> ( ) Call DIG (811) if you are doing any ground work. <br /> I` <br /> (V)Provide lot improvement committee with a copy of the city permit and drawings. <br /> (✓) When project is completed you must turn in the green permit for final inspection. <br /> 1; <br /> Remember if there are any chances in your plans they must be submitted before you <br /> cah continue your project. <br /> ti <br /> If�ou have any questions or concerns about your project please contact <br /> i The Board of Directors. <br /> l <br /> E <br /> is <br /> LotlmpApp-034-2019 <br /> i; <br />