Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots_ .shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot water'pipe insulation <br /> Insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:: <br /> Piping./a inch (19.'1 mm)and larger in-nominal diameter. <br /> Piping.serving more than:one dwelling unit. <br /> Piping located outside'the conditioned space.. <br /> Piping from the water heater to a-distribution manifold: <br /> Piping located under'a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower,door test shall be provided before C.O. <br /> 26.A copy of the enerr cacls shall be with permit at all times <br /> 27.. Copy ofrinal insulation retiort-shall be provided with permit before fnaL <br /> 28. No fence, pool or screen enclosure':&_ issued with thispermiz' <br /> F.F.E'.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />