Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with'a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31. inch (19.1 mm)and larger in nominal diameter. <br /> Piping.serving more than:one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the.water heater to.a distribution manifold., <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the enerzy eacls shall be with permit at all times. <br /> 27. Copy offinal insulation report shall be provided with permit before fnaL <br /> 28. No fence,pool or screen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />