Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016-N.E:C <br /> 24. In accordance with the Land Development Code,lots shall.be sodded before final at least 10 <br /> feet around the structure.. <br /> 25-. R403.5.3Hot water-pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:.. <br /> Piping 31.in, (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than.one dwelling unit: <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to.a distribution manifold: <br /> Piping'located under a floor slab. <br /> Buriied in piping.' <br /> Supply and return piping in fecirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before CO; <br /> 26.A cony of the enemy cacls shall be.with permit at all times <br /> 27.. Conti of final insulation report shall be provided with permit before fnah <br /> 28.No fence, pool or'screen enclosure :is-issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-.-Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) . <br />