Laserfiche WebLink
THermaL Expansion. anD BonDinG <br /> A thermal expansion gap is required per <br /> each continuous 40'length of modules. --- Bond•Path <br /> Grounding Lug <br /> Omit a coupling and leave a 2"gap in Not" <br /> the Rock-It Array Skirt and also between /---Cona�(EMY s <br /> the modules at that point. `��`°��' <br /> ® Roek•it Coupling <br /> It Rock-It Mount <br /> —Rock-It Array skirt <br /> MIR <br /> BracKeT SPaanG <br /> Portrait Orientation Landscape Orientation. <br /> i <br /> Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing Is 72"OC. <br /> 32mm modules:Max east/west bracket spacing-is-48"OC. <br /> Spacing may vary depending upon project specific structural requirements;I'e,high snow and wind load <br /> j areas may require lesser spacing E-W than the maximum.. <br /> j sTaGGereD LaYOUT canTlLever an.D.=oFFseT <br /> Staggered Mounting Points <br /> 1 � <br /> .§Rock-It Mount Rock It.Coupling Cantilever. Maximum cantilever is 1/3 bracket spacing. For portrait <br /> I The array Layout instructions in this Installation manual offer a orientation installations,check layout prior to Installing. <br /> general overview of layout. Periodically,due to a variety of Offset:Offset from all roof edges depends on wind speed,snow <br /> i factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location <br /> www.ecofastensolar.com info@ecofastensolar.com 877-859-3947 14 <br />