i
<br /> ZEPHYRHILLS FIRE DEPARTMENT
<br /> 38410 6th Ave Zephyrhills, FL 33542
<br /> FIRE.-,,.SERVICE USER FEES increase 1/1/2018
<br /> Occupancy No.:
<br /> Plan No.: Contractor:
<br /> Business'Name:- AVV&rw 14eg 4 rW Billing Address:
<br /> Business Address: -7o s'o e.4 2/_J�
<br /> Business,Phone,No.: Billing Phone No.:
<br /> Business Fax No.: Billing Fax No.:
<br /> Contact:' Contact:
<br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE
<br /> .Annual-
<br /> Education,healthcare,De
<br /> tentionBCorrectional Public
<br /> Gd Assembly,Business, schools,
<br /> a' Storage,Mercantile and Churches
<br /> Site Plan CO ($ N/C industrial. no charge Sprinkler $50
<br /> Multi-Family/Commerclal .03 W 'up to 800 sq ft $ 24.00 Standpipes $50
<br /> (Mlnimum.Charge$24.00 801.-1,500 sq ft $ 34.52 Fire Pump $50
<br /> a'Plan Revisions DBL. .1',501-2,500 sq ft $ 60.02 Hoods $50
<br /> 2,501-3,500 sq ft $ 90.02 Fire Alarm $50
<br /> SPRINKLER SYSTEMS 3,501-5,000 sq ft $ 127.52 LP Gas $50
<br /> �0-25-Heads $50• 5,501-7,500 sq ft $ .187.52 Natural Gas $50
<br /> ;26;plus,Heads $100 7,501-10' 00 sq ft $ 262.52 Fuel Tanks- pertank $50
<br /> STANDPIPE SYSTEM 10,001=15,000 sq ft $ 375.02 Sparklers $100
<br /> .0'Per Riser $50 15,001-20,000 sq ft $ 525.02 Fire'Works $500
<br /> FIRE PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation' $25
<br /> Per.Pump $100 10,001-401000 sq ft $ 1,050.02 Controlled Bum(15da; $100
<br /> FIRE ALARM SYSTEM 40,001-60,000 sq ft $ 1,500.02 Hood/Duct $50
<br /> 0-2&Devices $50 60,001=80,000 sq ft $ 2,100.02 Place of Assembly $50 Annual
<br /> 80,001-($2,100.02)per
<br /> 26,plus-,Devices $100 :ea add.1;000sq ft $ 0.06 Fire Protection $25
<br /> SUPPRESSION"SYSTEMS. ;< ;(Busiriess`closed until Flammable Application $50 Annual
<br /> Wet $50 violations corrected) Waste Tire Storage $50 Annual
<br /> Dry $50 SPRINKLER SYSTEMS Generator<.KW $100
<br /> CO2 $50. Hydro Undergrounds $45 Generator>30 KW $100
<br /> Other $56", ii lydrostaticTest $65 per system Bio-Hazard Waste $100 Annual
<br /> KITCHEN EXHAUSTHJ�Acceptance Test $45 per system Fumigation Tenting $50
<br /> Hood/D.ucts $50 Hydrant'Flow $75 Torch.Pot/Applied $50
<br /> .OTHER Haz.Materials $50 Annual
<br /> LP Installation,per tank $50 FIRE ALARM SYSTEM
<br /> Fuel.Tanklnstallation $50.: lSystem;Acceptance $50
<br /> (Rer1 ankj $50 e'Recall Acceptance $50
<br /> ❑Natural!Gas Installation $50 OTHER
<br /> (Pef',Syst'em) +FlPe Wall/Smoke Wall $15 perwall
<br /> Spray.Booth $50 ],-Watural
<br /> :.LP•Gas $25 per tank
<br /> Gas. $25 per system
<br /> Tent 10'x10'or greater $15 per tent
<br /> :Fire Pump $45
<br /> Tire Suppression $30
<br /> .System Acceptance
<br /> Exhaust Hood/Duct $30
<br /> Re-Inspection DBL
<br /> (other than annual)
<br /> Inspection scheduled DBL
<br /> and cancelled less than
<br /> 24 hours
<br /> Construction Insp. N/C
<br /> E ergency Vehicle Acce $50
<br /> PLANS TOTAL F/1-6 INSPECTION TOTAL IaL PERMIT TOT S
<br /> GRAND TOTAL
<br /> Comments:
<br /> Date: q 1ty7o..Inspector:
<br /> see.back
<br /> Am
<br /> �F'>�P�ts.,?`r,wl�ittYSF�'.�«"�«'%R^e.`t:nn7^ i?^•t�s�5snf•7aPS'k"xF,s�R.aa"7��t:,s�'r?Z�:zt�n�a�s,•^:wrazw•...�.armc•.rw<t¢s.�s-��+«cc.�nmee».+.+w �,•..e..w,..,��,,,.»..r.....<...-..,.s.»..............�....�..............,
<br />
|