Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping.31. inch (19.1 mm)and larger in nominal diameter._ <br /> Piping,serving more than one dwelling,unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold.. <br /> Piping located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided Before C.O: <br /> 26. A copy of the enerky cacls shall be With-yermit at all times <br /> 27. Cw offinal ihsuldtioif report shall be provided with permit before final <br /> 28. No fence, pool or screen enclosure I:is issued with:this permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) . <br />