Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> .24. In accordance with the Land De.velbonient Code, lots shall be sodded before final at least 10 <br /> -feet around the structure. <br /> .25:.R403.5.3Hot Water' 'Ipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance(R-value) of R-3.shall.be applied to the <br /> following: <br /> Piping.31,inch (1.9.1 mm)and larger_in.nominal diameter. <br /> Piping,serving more than:one dwelling unit. <br /> Piping located outside the conditioned space:., <br /> Piping from the:water heater to:a distribution manifold: <br /> Piping'located under a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation-systems. <br /> 25.Blower door test shall be provided:before C.O <br /> 26. A cony ofthe-energy cacls shall be with permit at all times <br /> 27. Cony offinal'insulatioiz report shall be Provided with permit before fnaL <br /> 28. No fence, pool or screen-enclosuke :isi issued with ahis permit` <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6'Edition <br /> R.O.W:-Right of Way. <br /> A.D:A,Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />