Laserfiche WebLink
23. Tamogr- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at.least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water:pipe insulation. <br /> Insulation for hot water pipe with-a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping v. inch (19.1 mm) and larger in:nominal diameter. <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the:water heaterto.a distribution manifold:- <br /> Piping-located under a floor slab. _ <br /> Buried-in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower-door test shall be provided before C.O: <br /> 26.A cony of the ene'r"�eaclsshall be with nerwnit at all times <br /> 27. Cony offinal insulation report shall be provided with nern:it before fnal <br /> 28. No fence,pool or screen enclosure :is issued ivithahispermit' <br /> F.F.E.-Finished_ Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act. N.E.C.-National Electric.Code(2016) <br />