Laserfiche WebLink
23..Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least.10 <br /> feet around the structure._ <br /> 25. R403.5.3Hot water,pipe insulation <br /> Insulation for_hot.water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:: <br /> Piping 31,inch (1.9.1 mm)and larger.in nominal diameter. <br /> Piping serving more than one dwelling unit: <br /> Piping located outside'the conditioned'space:. <br /> Piping from the:water heaterto a-distribution-manifold:- . <br /> Piping located under a floor slab:- <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blower.door test shall be provided More C.O. : <br /> 26. A copy of the energy cacls shall be with pernsit at all times: <br /> 27. Copy of final insulation report shall be provided ivith peim if before rnaL- <br /> 28. No fence,pool or'screen enclosure :is issued with:this permit <br /> F.F. .-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way.. <br /> A.D.A.=.Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />