Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot.water pipe insulation. <br /> Insulation for-hot water-pipe with'a minimum thermal resistance (R.value) of R-3 shall.be applied to the <br /> following: <br /> Piping 31; inch (1.9.1 mm)and larger in:nominal.diame_ter.. <br /> Piping,serving more than one dwelling unit. <br /> Piping located.outside the conditioned space:_ <br /> Piping from the water heater to a distribution manifold. <br /> Piping:located under,a floor slab. <br /> Buried in piping, <br /> .Supply and return piping in recirculation systems other than demand'recirculation systems. <br /> 25. Blower door test shallil be provided before C.O. <br /> 26. A copy of the enemy cacls shall be=with'permit at all times <br /> Z. Copy of fnaTinsulation report shall-be provided with permit before rinal <br /> 28.No.fence,-pool or screen enclosure :is issued with This-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 60'Edition <br /> R.O.W.-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />