Laserfiche WebLink
23..Tamper-'Resistant.Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development C.ode,lots,shall.be sodded before final at-least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot Water.pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance () - slue) of R-3 shall.be applied to the <br /> following: <br /> Piping4. inch (19.1 mm)and larger in:nominal diameter., <br /> Piping serving more than one dwelling unit: <br /> Piping located outside the conditioned space:. <br /> Piping from the water heaterto a distribution manifold., <br /> Piping:located under.a floor slab. <br /> Buried in piping.: <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower.door test shall be provided before C.O: . <br /> 26. A_copw of the energy cacls shall be with perinit at all times <br /> 27. Cop u of finalinsulation�report slialhbe provided with Hermit before rnal <br /> 28.No fence,pool or'screen enclosure':is issued with ihis.permit. . <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with.Disabilities Act N.E.C.-National Electric Code(2016) <br />