Laserfiche WebLink
23,Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure: <br /> 25. R403.5.3Hot Water'pipe insulation. <br /> insulation for hot.water pipe With-aminimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping:V. inch (1.9.1 mm)and larger,in.nominal diameter., <br /> Piping:serving more than_one dwelling'unit: <br /> Piping located outside the conditioned space:_. <br /> -Piping from the:water heater to:a:d.istribution manifold: <br /> Piping.locateii under.a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O: <br /> 26.A copy of the energy cacls-shall be with uermit at all times. <br /> 27.'Cop.of final insulation report shall be provided with permit before rinaL, <br /> 28.No.fence,pool or screen enclosure Is issued with:thispermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> RAW-Right of Way <br /> A.D.A.=Americans with Disabilities-Act N.E.C.-National Electric Code (2016) <br /> 1 <br />