My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-1040
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-1040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2022 2:55:31 PM
Creation date
2/27/2022 2:55:30 PM
Metadata
Fields
Template:
Building Department
Company Name
DUKE ENERGY
Building Department - Doc Type
Permit
Permit #
20-1040
Building Department - Name
DUKE ENERGY
Address
MEDICAL ARTS CT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYMBOLS: <br /> ® Work Area <br /> ■ Channelizing Device(See Index 102-600) <br /> [}i Work Zone Sign Buffer <br /> Space 250 C B A <br /> 0- Flogger ee <br /> b Lane Identification+Direction of Traffic Table 1 0 <br /> - `� vaFetuo xao wo <br /> 11 roarro u�p x�xo <br /> to a <br /> _________________________________�.�.. ------------__—____—_______—_---_-- <br /> b Work area b <br /> Tangent Device Spacing(See Table 1) <br /> VARK OISWR BE ■ <br /> xuexo osroMov Taper Length <br /> D 50'To 100 -*May Be omitted if ROAD WORK AHEAD sign is installed upstream within the project limits. <br /> A B C <br /> WITHOUT TEMPORARY RAISED RUMBLE STRIPS <br /> GENERAL NOTES: <br /> TABLE ] <br /> 1.Special Conditions may be required in accordance with these notes 4.When a side road intersects the highway within the TTC zone,place <br /> and the following sheets: additional TTC devices In accordance with other applicable TCZ Indexes. DEVICE SPACING <br /> 5.The two channelizing devices directly In front of the work area may be Maximum Spacing Maximum'S arin of Distance <br /> A.Railroad Crossings: P B P 9 <br /> omitted provided vehicles in the work area have high-Intensity ro[aNng. Between <br /> a.1/an active length <br /> plus <br /> crossing Is located closer to the Work Area than Posted b Cones ke Type 1 or Type if Sign Buller <br /> the queue length plus 300 Feet,extend the Buffer Space as shown on flashing,oscillating,or Strobe lights operating. Speed Tubular Markers Barricades/Panels/Drums 9 Space <br /> Sheet 3. 6.When Buffer Space cannot be attained due to geometric constraints,use <br /> b.if the queuing of vehicles across an active railroad crossing cannot be the greatest attainable length,not less than 200 ft.for posted speeds On a On a On a On a <br /> avoided,provide a uniformed traffic control officer or Flogger at the greater than 25 mph. Taper Tangent Taper Tan cent A B C D <br /> highway-rail grade crossing to prevent vehicles from stopping within 25 20' SD 20' 50' 200' 200' 200' 100' 15S <br /> the highway-raft grade crossing,even If automatic train warning 7,ROAD WORK AHEAD and the BE PREPARED TO STOP signs may be omitted if <br /> devices are in place. 30 20' 50, 201 50' 200' 200' 200' 100' 200' <br /> B.I/the Work Area encroaches on the Centerline,use the Layout for all of the following conditions are met: <br /> Temporary Lane Shift to Shoulder on Sheet 3 only If the Existing 35 20' 50, 20' SO 200' 200' 20V 1001 2501 <br /> Paved Shoulder width Is sufficient to provide for an 11'lane A.Work operations are 60 minutes or less. 40 20' 50 20' 50, 200' 2001 200' 100' 305' <br /> between the Work Area and the Ede of Existing Paved Shoulder. B.Speed limit Is 45 mph or less. <br /> g g C.There are no sight obstructions to vehicles approaching the work area for 45 20 50 20 SO, 350' 350' 350' 17Y 360' <br /> Reduce the posted speed when appropriate. a distance equal to the Buffer Space shown in Table 1. 50 ZD SD 20 100 500 500 5001 250' 425' <br /> 2.Temporary Raised Rumble Strips: D.Vehicles In the work area have high-intensity,rotating,flashing,oscillating, 55 2D SD 20 100' 2640' 1500 IOOO 500' 495' <br /> or strobe lights operating. <br /> A.Use when both of the following conditions are met concurrently: E.Volume and complexity of the roadway has been considered. 60 ID so, 2D 10, 2640' 1500' I000' 500' 570' <br /> a, Existing Posted Speed is 55 mph or greater; F.IF a railroad crossing is present,vehicles will not queue across cal!tracks. 65 20 50' 20' too, 2640' 1500' 1000- 500' 645' <br /> b.Work duration Is greater than 60 minutes. G.AFADs are not In use. <br /> B.Use a consistent Strip color throughout the work zone. 7O 20' S0 20 100' 2640' I50O IOOO 500' 730' <br /> C.Place each Rumble Strip Set transversely across the lane at locations B.See Index 102-600 for general TCZ requirements and additional information. <br /> shown. 9.Automated Flogger Assistance Devices(AFADs)may be used In accordance <br /> D.Use Option I or Option 2 as shown on Sheet 2.Use only one option with Specifications Section 102.990 and the APL vendor drawings. <br /> throughout work zone. <br /> 3.Additional one-way control may be provided by the following means: CONDITIONS <br /> A.Flag-carrying vehicle; WHERE ANY VEHICLE,'EQUIPMENT,' <br /> B.Official vehicle; <br /> C.Pilot vehicles; WORKERS OR THEIR ACTIVITIES <br /> D.Traffic signals. ENCROACH THE AREA BETWEEN <br /> THE CENTERLINE AND A LINE 2' <br /> When flaggers are the sole means of one-way control,the Flaggers <br /> must be in sight of each other or in direct communication at all times. OUTSIDE THE EDGE OF TRAVEL WAY. <br /> k <br /> a <br /> LAST DESCRIPTION: FY 2020-21 INDEX SHEET <br /> REVISION FDOT TWO-LANE, TWO-WAY, <br /> 11101117 w �—.. STANDARD ,PLANS WORK WITHIN THE TRAVEL WAY 102-603 1 <br /> Of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.