My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1321
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2022 3:02:27 PM
Creation date
2/27/2022 3:02:26 PM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
20-1321
Building Department - Name
CITY OF ZEPHYRHILLS
Address
38116 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOT-13-06 <br /> (See Note 6) W10-IF <br /> G20-2 <br /> (See Note 6) ROAD <br /> w�WORM <br /> WORK <br /> ENO R+@W AHEAD <br /> s <br /> ROAD WORK <br /> NOTES: X <br /> 1.This Index applies to Two-Lane,Two-Way <br /> 6"White(See Note 7) <br /> and Multilane Roadways,Including Medians _ _ <br /> ------------ <br /> of divided roadways,with work on the `T/ _ /•-Z` <br /> shoulder. C�• 10'Min. <br /> 2.L=Taper Length <br /> X=Work Zane Sign Spacing ——_ /———__—=—.7: 7�_ . �_ _ <br /> 7_77B=Buffer Length -— .L 'sL!L — <br /> See Index 102-600 for"L","X","B",and X I_ X X TF X <br /> channelizing device spacing values. _JjL B <br /> 3.For Incidental work(e.g.mowing or litter <br /> removal),only the Road Work Ahead sign ROAD SREEnam tu&s PIGNi <br /> is required. WORK DOUM sMou R END <br /> AHEAD ""On <br /> "O ......... RDAD WDRK <br /> 4.When four or more work vehicles enter the WHEN WORM <br /> through traffic lanes in a one hour period MOT-13-06 G20-2 <br /> (excluding establishing and terminating the W20-IF (See Note 6) W21-Sa (See Note 6) <br /> work area),use a flagger or lane closure <br /> to accommodate work vehicle ingress and TWO-LANE ROADWAY <br /> egress. SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY <br /> WITH WORK ZONE SPEED OF 45 MPH OR LESS <br /> 5.For work less than two feet from the <br /> traveled way and work zone speed is <br /> greater than 45 MPH,use a lane closure. <br /> 6.The"Speeding Fines Doubled When Workers <br /> PresenCsigns(MOT-13-06)and"End Road W20-IF <br /> Work"Signs(G20-2)along with the G20-1 <br /> associated work zone sign spacing (See Note 6) ROAD <br /> distances may be omitted when the WORK <br /> temporary condition is in place for 24 END AHEAD <br /> hours or less. ROAD WORK <br /> 7.Temporary pavement markings may be X <br /> omitted when the work zone Is 7n place Q] <br /> for 3 days or less. <br /> 8.If the work encroaches on a marked bicycle <br /> lane or ridable shoulder,close the lane or <br /> shoulder in accordance with the Plans. —— —— — ■ /, <br /> 9.Omit'Shoulder Closed'signs along X I with <br /> XI <br /> with associated work zone signgn spacing <br /> distances for work on the medianL <br /> ROAD RIGHT <br /> SYMBOLS: WORK SHOULDER END <br /> AHEAD CLOSED ROAD WDRK <br /> ®Work Area <br /> G20-1 <br /> ■ ChanneNzing Device(See Index 102-600) W20-1F W21-Sa (See Note 6) <br /> D Work Zone Sign <br /> TWO-LANE ROADWAY <br /> Lane Identification and Direction o/Traffic SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY <br /> R <br /> AS <br /> ;e DESCRIPTION: <br /> REVISION FY 2021-22 INDEX SHEET <br /> FDOT AND A MULTILANE, WORD ON SHOULDER11/01/20 W �� STANDARD PLANS <br /> 102-602 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.