My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-20126
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-20126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2022 3:10:54 PM
Creation date
2/27/2022 3:10:53 PM
Metadata
Fields
Template:
Building Department
Company Name
TECO GAS LINE
Building Department - Doc Type
Permit
Permit #
20-20126
Building Department - Name
TECO GAS LINE
Address
MIS SEE DESCRIPTION PRETTY POND
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ZEPHYRHILLS.— BUILDING DEPARTMENT <br /> RIGHT-OF-WAY USE PERMIT <br /> DATE: 3/1'6/2021 <br /> PERMIT#: <br /> No construction under ground or above ground of any facility shall be accomplished on any City Rights of Way without written approval from the City Building <br /> Department. Any application for approval of constriction operations on any City owned Rights of Way shall furnish-a detailed drawing showing the complete <br /> scope of the-proposed w&k.in triplicate to the office:cf.the Building:Official for approval prior to the commencement of any work. A copy of this permit is to be kept <br /> readily available at the.site of the work at all times. <br /> PARCEL ID#: 35-5-21-0131-00000-0110 CITY ROAD Pretty Pond Rd <br /> LOCATION (Legal Description): <br /> 7490 Gall Blvd, Zephyrhills, FL 33541 <br /> Permission is hereby granted to Jared Willingham : . . of . ::.-TECO Peoples Gas <br /> For the construction and maintenance of: .. <br /> installation of 411 coated steel. across Pretty Pond. Rd, <br /> a farm.tap and.a 1-1/4! ' PE pipe to provide service to 7490 Gall Blvd. <br /> Subject to the following conditions: <br /> 1. The construction and maintenance of such utility shall not interfere with the property and-rights of a prior occupant. <br /> 2. All work shall be done in keeping with-the standards of the City Streets Department and under the supervision of the City Building Official,who will <br /> be notified at least one day priorto commencement of construction. <br /> 3. All materials and equipment shall be subject to inspection by the City Building Official: <br /> 4. During construction all safety regulations;of the Department of Transportation shall be observed and the City shall be relieved of all responsibility <br /> from damage of any nature arising from this permit. Subject to the same terms and conditions,the permit holder may take such safety measures, <br /> including placing and display of caution signs;as it may deem necessary in conduct of construction and maintenance work hereunder. It is the <br /> responsibility of the permittee to???? <br /> 5. AII private and all City property shall be.restored to its.original condition as far,as practical in the opinion of.the City Building Official..:. <br /> 6. All underground crossing installations shall be laid at such depth as may be specified by the City Building Official. <br /> 7. The sketch covering the details of this installation shall be made a part of this permit. This permit is granted with the understanding that the applicant <br /> has notified all other utility users in.the area covered by the permit and takes full responsibility for any damage incurred by prior installations as a. <br /> result of his operations in order that they may safe guard their interests.. - <br /> 8. It is expressly stipulated that this permit is a license for permissive use only and that:the placing of facilities upon public property pursuant to this <br /> permit shall not operate to create or to vest any property right in said holder. <br /> 9. Whenever the City decides to further exploit the City Rights of Way,any or all said poles,wires,pipes,cables;or other facilities and appurtenances <br /> authorized hereunder,shall be immediately removed from said Rights of Way,or reset or relocated thereon as:required by the City Building.Official <br /> at the expense of the holder of this permit. <br /> 10. The holder shall save.and keep the City harmless:from any and all damages, claims, or injuries that may occur by reason of the construction, <br /> maintenance;and operation of said facility. <br /> 11. The holder shall complete the requested work within 120 days or this permit shall become null and void. In the event the work:requested is not <br /> completed upon the expiration date of this permit,the City shall have the right to complete-such work and to charge the holder of:the permit for all <br /> costs incurred in,completed said work. <br /> 12. The holder shall post a cash or surety bond with the-City Manager.in.the sum of.$. dollars to guarantee performance of the obligations <br /> herein: and to guarantee maintenance of the right-of-way described'herein for a period of one (1)year following completion of the requested <br /> installation. In the event a surety bond is posted,the surety bond shall be made payable to the City and shall obligate the surety to hold the City <br /> harmless in the event the holder of this permit should fail to meet any of.its obligations hereunder. The bond shall also indemnify the City for all <br /> court costs and reasonable attorneys fees in the event legal action is required to collect on said bond. <br /> SUBMITTED BY: <br /> (PERMITTEE) Jared Willingham <br /> Signature&Title (Authorized TECO People's Gas Representative) <br /> Address 8416 Palm River, Tampa, FL 33619 <br /> APPROVED BY: <br /> CITY OF ZEPHYRHIILLS <br /> Utilities Supervisor Date <br /> Public Works Date 2VAy-Q2/ "NO M0,110V PE-406 Ze ✓)l lnegF,6 fmnt� r <br /> Building Dept Date <br /> City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.