Laserfiche WebLink
i <br /> ZEPHYRHILLS FIRE DEPARTMENT <br /> 38410 6th Ave Zephyrhills,'FL 33542 <br /> FIRE SERVICE USER FEES increase 1/1/2018 <br /> Occupancy.No.: <br /> Plan No_: Contractor: sic$') e, /41-a¢4A--- <br /> Business Name: Billing Address: <br /> Business Address: <br /> Business,Phone.No.: Billing Phone No.: <br /> Business Fax No.: Billing Fax No.: <br /> Contact:' Contact: <br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE <br /> Annual- <br /> Education,healthcare,De <br /> tention&Correctional Public <br /> Assembly,Business, schools, <br /> Storage,Mercantile and -Churches <br /> Site Plan N/C Industrial. no charge Sprinkler $50 <br /> 'Multi-Famlly/Commerclal :03.sf up to 800 sq.ft $ 24.00• Standpipes $50 <br /> (Minimum Charge$24.00 801-1,500-sq ft $ 34.52 Fire Pump $50 <br /> Plan Revisions DBL. :1,501 2,500 sq ft $ 60.02 Hoods $50 <br /> 2,501-3,500 sq ft $ 90.02 Fire Alarm $50 <br /> SPRINKLER SYSTEMS 3,501-5,000 sq ft $ 127.52 LP Gas $50 <br /> H0-25-Heads $50• 5,501-7,500 sq ft $ .187.52 •Natural.Gas $50 <br /> :2,6,p1ue,Heads $100 71501-10,000 sq ft $ 262.52 Fuel-Tanks- pertank $50 <br /> STANDPIPE SYSTEM A0;001A5,000 sq ft $ 375.02 Sparklers $100 <br /> a`Per.Riser $50 15,001-20,000 sq ft $ 525.02 Fire Works $500 <br /> FIRE PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation' $25 <br /> Per Pump $100 3.0,001-40,000 sq ft $ 1,050.02 Controlled Bum(15da: $100 <br /> FIRE:ALARM SYSTEM 40,001=60,000 sq ft $ 1,500.02 Hood/Duct $50 <br /> 0-25"Devices $50 60,001=80,000 sq ft $ 2,100.02 Place of Assembly $50 Annual <br /> 80,001=($2,100.02)per <br /> 26,plus Devices $100 ea.add.1;000sq ft $ 0.06 Fire Protection $25 <br /> SUPPRESSION'SYSTEMS. ,,;' k(Business'closed;until FlammableAppltcation $50 Annual <br /> Wet $50 ':;violations corrected) Waste Tire Storage $50 Annual <br /> Dry $50 _:'.SPRINKLER SYSTEMS Generator<KW $100 <br /> CO2 $50 ,,Hydro Undergrounds $45 Generator>30 KW $100 <br /> Other •$56 '�HydrostaticTest $65 per system Bio-Hazard Waste $100 Annual <br /> KITCHEN EXHAUST `Acceptance Test $45 per system Fumigation Tenting $50 <br /> Hood/D,ucts $50 Hydrant'Flow $75 Torch.Pot/Applied $50 <br /> .OTHER Haz.Materials $50 Annual <br /> LP lnstallation.per•tank $50 FIRE ALARM SYSTEM <br /> Fuel Tank Installation .$50: ;System-Acceptance $50 <br /> (Per:Tank), $50 Lj Recall Acceptance $50 <br /> Natural-Gas installation $50 OTHER <br /> (Per'SySt'e111) *lte Wall/Smoke Wall $15 perwall <br /> Spray.Booth $50 1P Gas $25 per tank <br /> 'Natural Gas- $25 per system <br /> Tent 10'x10'or greater $15 per tent <br /> '+Fire Pump $45 <br /> lFIre Suppression $30 <br /> ;System Acceptance <br /> 'exhaust Hood/Duct $30 <br /> Re-Inspection DBL <br /> (other than annual) <br /> Inspection scheduled DBL <br /> and cancelled less than <br /> 24 hours <br /> Construction Insp. N/C <br /> Emergency Vehicle Acce $50 <br /> PLANS TOTAL rj o INSPECTION TOTAL / 7, PERMIT TOTAL <br /> GRAND TOTAL IF a 7-7 S , <br /> Comments: <br /> Date: q 75s .Inspector: <br /> see.back - <br /> nib <br /> 'tt.an'i":'^'7 b't'+ om+rAwT r'•r^.C—r-- IA!a?q'.NsYSw-..rAY.>dr.,.^J:..*xn.x•.=su�y`.z`�irar=o�smmraa�r.e-� r.:."nrsr"u..r t«a>eve:.+rrn«.w.one.,,+e...-..,,.y....r.,...o.n•.,,-.o-.,--•.�......»...........��.�....../ <br />