Laserfiche WebLink
Commercial EPA Certified <br /> Refrigeration State Certified <br /> Air Conditioning CFESA Certified <br /> Heating Systems ®® Established in 1906 <br /> Kitchen Equipment 24hr Emergency Service <br /> Ventilation.Systems TWC SE/?Y/CES Parts and Equipment Sales <br /> Beverage Equipment Ice Machine Sales and Leasing <br /> PRICING DETAIL <br /> Customer: Speedway (217248) Date: 3/3/2020 <br /> Speedway#6858 Zephyrhills (09535) Quote#: 148144 <br /> Project: Replace split a/c condenser and Customer PO: <br /> evaporator Work Order: 6339438 <br /> EQUIPMENT <br /> Description Quantity Unit Price Subtotal <br /> 5 ton Split System 1.00 4,164.37 4,164.37 <br /> MATERIAL <br /> Description Quantity Unit Price Subtotal <br /> Heat shield 1.00 19.75 19.75 <br /> Float Switch 2.00 32.93 65.85 <br /> Emergency Drain Pan 1.00 62.56 62.56 <br /> Copper Tubing 40.00 1.19 47.41 <br /> Copper Tubing 40.00 3.31 132.36 <br /> Insulation 36.00 1.12 40.30 <br /> Hurricane pad 1.00 74.07 74.07 <br /> Safety controls 2.00 39.51 79.02 <br /> Copper Fittings 1.00 41.15 41.15 <br /> Copper Fittings 1.00 65.85 65.85 <br /> Duct Material 1.00 123.45 123.45 <br /> UV paint 1.00 32.93 32.93 <br /> Piping Supports 4.00 19.76 79.02 <br /> Drain Line& Fittings 1.00 41.15 41.15 <br /> R410A Refrigerant 5.00 11.95 59.75 <br /> Subtotal 964.62 <br /> LABOR <br /> Description Hours Hourly Rate Subtotal <br /> Technician-Overtime 13.50 120.00 1,620.00 <br /> Technician-Overtime (#2) 13.50 120.00 1,620.00 <br /> Travel Time-Overtime 2.00 120.00 240.00 <br /> Incurred no travel 2.75 80.00 220.00 <br /> Subtotal 3,700.00 <br /> OTHER <br /> Description Quantity Unit Price Subtotal <br /> Electrical subcontractor 3,105.00 <br /> Torch Charge 1.00 30.00 30.00 <br /> Recovery Charge 1.00 50.00 50.00 <br /> Quote#148144 1 Revision#1 <br /> 13937 Lynmar Blvd'Tampa,FL 33626'Phone(813)884-0037`www.twcservices.com <br /> Page 3 of 5 <br />