Laserfiche WebLink
• Series 700 <br /> Plashed L.-Foot <br /> 7) L .. <br /> the Dears the rafter ''r' <br /> ar. un deck'ng of underneath <br /> Berne In th the roof by to th <br /> e eaves or . looking <br /> ) rill a pilot hole t in the attic, <br /> z g material i through the <br /> intsure that into the rafter to <br /> a solid the lag bolt will• is portio of the be located <br /> rafter ' n <br /> • hole not found the rafter. If the <br /> u�mediately with roofintke pilot <br /> • ' 3) Apply r-o g sealant. <br /> the <br /> bottorp °ping sealant to <br /> directly <br /> nsure aonto the tag' <br /> ag the be and <br /> } = 1 water tight seal. <br /> to <br /> + Attach the <br /> ernb a lag bolt and base with <br /> into e mint of 2 a minim <br /> to the rafter. Ti 2 lag shankrn <br /> ? • :. ::� seat with a handhten Lag bolt <br /> 5 French. <br /> Slide the flashing the row, shingling underneath <br /> above the i = directly ath <br /> nstalled standard base, <br /> and then line <br /> base ing with the thruP eads <br /> in the <br /> UP shingles t ay be necessary on the <br /> With a breaker <br /> to pr <br /> 6 esker bar, y <br /> r t ) Attach i:��� �. s portion of the L-foot to <br /> from the fl the base thanks threaded <br /> the fla asking, T is protrudi <br /> - : _ w• to 70 -16e bolt over ten tighten ng <br /> a k s ft-ibs n threw <br /> ds <br /> i , +r attached in anrhe L-foot can <br /> e <br /> y orientation. <br /> ' -��,�•*.="•'-;; "� Only <br /> ack en <br /> and be used i hneered syste hardware. SnapNrac ms skould <br /> ' "� may void Any alter k com <br /> s � d the warrant nrnatn a ponents <br /> calculations could pplication <br /> y and becorpe structural <br /> invalid. <br /> k� <br /> f - f If a pilot h I <br /> o oe <br /> x un is <br /> c d immedials drilled and a rap <br /> � r ,t� .r roofing seal y seal ter is <br /> _. w _ - po ant to pilot h not <br /> not avoi ole <br /> at! _ b���'� over a w with <br /> �s w� ,�.*• - Always �„ tighten hardware. <br /> dams <br /> and safet ear fall Prot dware, ge. <br /> y gear, ection <br /> a "4 <br /> JfCJ s e�` � •`:c','F ��''�s to help "cis; <br /> ►. "c+tj be nip configures suite of design M_ .. your PV . tools <br /> ,. , s. •. y an accurate an <br /> visit us at. Ww Installation to <br /> d fast install. <br /> w.Snap Nrack.comPlease <br />