Laserfiche WebLink
r <br /> - - 1 Series 700 <br /> Corrugated g1oc <br /> fi `1 /_ <br /> K <br /> iq r ;J4 1) LOCat l Si.11� <br /> ' ►, a the <br /> the deckin rafter under)the screws. eath <br /> Of the roof b under The rafter liesY locating <br /> neathe the screws. directly <br /> 2) Drill a pilot <br /> material into hole throu <br /> the lag bolt the rafter to gh the roofing <br /> • portion of will be locate ensure that <br /> —' not the rafter. d into a <br /> ;�-- found the If the raft Soria <br /> immediately witherol the pilot hoee is <br /> ' 3) Apply ofrng sea <br /> l <br /> ant. <br /> dire tl roofing s ea/ant <br /> lag to y our° the pilot hole and <br /> ens <br /> Water <br /> 4)Attachtight seal. <br /> ` rfOot usig a Corrugated BIo <br /> ck appropriate Ia 16"1 h bolt (Ty with <br /> g with p) <br /> the rembafter tere Ti of ,»I minima <br /> ghten lag <br /> shank into <br /> S) Ti g bolt to seat. <br /> ghten L-fo <br /> . hardware to 1f l assembly silver <br /> 76 ft-Ibs <br /> 7`G}r�, S <br /> aPNrac <br /> �.+..., only be used engineered s <br /> an hard with SnapNrystems should <br /> ware An ack <br /> May voi Y alternate a components <br /> calculations C uld becomwarrante <br /> and str pplication <br /> f C1 me i uctural <br /> nvalid. <br /> RUUD <br /> of ho►e <br /> found, immede is drilled and <br /> rsofrng sealant to seal pilot hole with <br /> is not <br /> A/wnot over tighten havoi water damage. <br /> and sa ety gearall protec�onare. mage. <br /> SnapNrack <br /> to help a cconf, has a suite <br /> �of <br /> be an pure your design tools <br /> visit us urat 'nstailation to <br /> at: wwwSndafast <br /> N aicktaoimplease <br />