Laserfiche WebLink
Series 700 <br /> ' <br /> 5O��so T"t Mount <br /> 1, te the raf <br /> \ ; r r $ decking of ter under i` if.i <br /> roof surface with of aY tap Bath the <br /> 2) Drill comer. <br /> g the <br /> material <br /> pilot hole thro <br /> the 1a a/into the rafter to ensure roofing <br /> • porting o1 it will be loca <br /> • not the rafter ted intora that <br /> If the rafter isolid <br /> nand then Seal the <br /> • . _ immediately with r pilot <br /> hole <br /> e <br /> ., ` � of Apply roofing scald g sealant. <br /> ase sea/ant the <br /> hole to ensure a Water' i Onto the prom <br /> 4 tight seal. of <br /> "~- a S%16aeh the -foot <br /> _ •,�r ,�,� ,t embe lag bolt and base with <br /> fJ rafter.d ghtenfLa9 bloshank <br /> nto <br /> Olt to attsea the <br /> �.r 5) Next t. <br /> and ac to <br /> the Set the cone flashindOff to the base <br /> the standoff and e <br /> • • surface. directly a Y sliding it over. <br /> and attachm Use all necessary <br /> it to <br /> ent e all n essary scald the <br /> • • 6) Attach the methods for flashing is <br /> • it over Stan <br /> Q the doff <br /> desir Y sliding <br /> F ' to the Standoff shaftlamp b n silver hardware height and Adjust n it g <br /> black hardware to 916 ft-lbs and fobs, <br /> only b Nrack engineered <br /> and e used kith sYste <br /> 4; ' J - :'�r ma hardware, SnapNrack cos Should <br /> '`— r Y void the Any alternate components <br /> calculations couja antY and str application <br /> ctur <br /> j} i- �,,�� ecorrie invalid. al <br /> t <br /> found lint hole is drilled <br /> roofing <br /> Is <br /> Sea, and a rafter <br /> `' is <br /> Always ovea tighten avoid <br /> �aterhdama-qe. t <br /> Fear hardware <br /> ge <br /> and safety gear, <br /> protection <br /> x` <br /> rIDU <br /> SnapNrack ha'u`� <br /> to <br /> oe help configured Suite of design <br /> an accurate Your PV instag tioo�to <br /> visit us at: ww and fast instal/ <br /> wSnaPNrack., lease <br />