My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-62
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-62
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 10:48:58 AM
Creation date
3/2/2022 8:11:03 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-62
Building Department - Name
COPPLE,RONALD & SUSAN & ALTI
Address
37120 CULLENS TRAIL
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Series ipp <br /> r V 140 <br /> '4S° T <br /> M <br /> °ant <br /> Oca e the r ^•�^ ",j , ,. . <br /> decking of the after underneat 5!I ,J j <br /> • roof surface rOOF by tappin h the <br /> e with a hammer. g the <br /> 2) Drill a pilot hal <br /> 3 — material i e thro <br /> ,. the lag bolt the rafter to h the roofing <br /> r _ portion of will be locat ensure that <br /> ` not found the rafter. If the into a solid <br /> 'mmediately withal the rafter <br /> is <br /> 3 Pilot sea/ant. <br /> _ ) Apply roof- <br /> he g sealant to <br /> hole to ens and directly onto the bottom <br /> are a water <br /> F 4) Attach tight eale pilot <br /> ch the standoff a 5/16" ndoff base <br /> lag bolt <br /> " , • embedment of and a minima ith <br /> rafter. 2 /" m <br /> f S) Ne Tighten Lag bog to sea�nto the <br /> xt attac <br /> x I q~ and sett h the stan <br /> ' r the standoe cone flashi doff to the base <br /> roof surface and directly a y sliding it o <br /> and at Use all pp/yin over <br /> tachmen ar a it to the <br /> l t metho s <br /> for flashing. <br /> Attach fibs methods <br /> nts <br /> -� .6)fi s <br /> °ver the standoff standoff cla <br /> to the the <br /> ndoff shaft 'np by sliding <br /> Silver hardwareed height and Adjust it g <br /> black hard to 7p- tighten <br /> 7 are � 16 ��sbs and <br /> tQ 9 ft- <br /> I )Attach the <br /> then tighte scrap rail a <br /> 7 9f ftlbs and b�wk hardware to doles <br /> lbs. Rem a hardware to �- <br /> { S) Use e tilt tool. <br /> Support the to pNrack tilt tool <br /> Page 36 for in t ail in place {sea <br /> ctions.) <br /> t <br /> SnapNrack <br /> Only be engineered <br /> -'-- _ mad hardwarrewAn ith SnapNrackecas should <br /> y void the y alternate mponents <br /> - - calculations couarranty and st application <br /> 4 d beCOmQ invalidural <br /> p w��t" <br /> found imt hole is drilled <br /> roof, mediate) and a rafter is <br /> I - DO not ea/ant <br /> tO av sea'Pilot hole with not <br /> r - Always we tighten hard' <br /> ter damage. <br /> r�,,� and ear fall dware, <br /> ` - rr "�1 safety gear, protection <br /> I J nm i S <br /> ire,a9c, <br /> to napNrack has a <br /> suite <br /> be help configures Of design <br /> visit us Your PV . <br /> of WW and fas install a tlon to <br /> w.SnapNrack.comPl ease <br />
The URL can be used to link to this page
Your browser does not support the video tag.