My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-118
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 11:09:32 AM
Creation date
3/2/2022 8:56:56 AM
Metadata
Fields
Template:
Building Department
Company Name
SF ZEPHYR COMMONS OUTPARCEL LP
Building Department - Doc Type
Permit
Permit #
20-118
Building Department - Name
SF ZEPHYR COMMONS OUTPARCEL LP
Address
38011 PRETTY POND RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:4E36FD70-9689-46BE-A761-56385A3E3120 <br /> agreements or promises by and between the parties, except as aforesaid, and that any additions thereto or changes therein shall be in <br /> writing. Both copies of this agreement must be electronically signed and returned within ten (10) days of the above Subcontract date.A <br /> signed acknowledgment copy will be sent electronically to the Subcontractor.This agreement is subject to cancellation if not signed and <br /> returned within ten (10)days of the above Subcontract date. <br /> IN WITNESS WHEREOF,the parties hereto have set their hands and seal the day and year first above written. <br /> Subcontractor Contractor <br /> ACS Fire&Security J. Raymond Construction Corp. <br /> By: By: <br /> Print Name: Roman Rudzi k Print Name: <br /> Title: CFO Title: <br /> Date: 3-23-20 Date: <br /> Federal ID: 26-0016168 <br /> We are requesting the following Clarifications be added to the subcontract agreement: <br /> 1. Add-Current scope of work is based on ACS proposal and the current MEP design provided to ACS, if additional devices and <br /> equipment are required additional costs would apply. RR <br /> 2. Add-AHJ may require additional devices over and above the current scope based on MEP design and AHJ comments which <br /> could result in additional costs. RR <br /> 3. Add-It is understood that the permitting and inspections are contingent on AHJ time frames and schedules out of ACS control, <br /> ACS is not responsible for these delays-RR <br /> 4. Add-AHJ approval of system supersedes the requirements of owner and engineers, unless agreed by both parties-RR <br /> 5. Add-If other trades impact ACS installation or inspections, additional costs and remobilization charges shall apply.-RR <br /> 6. Add-ACS bid is provided in a competitive market and based on efficient prosecution of the work.ACS will provide GC and EC <br /> with an approved set of plans for the project.All back boxes and flex are provided by others, and must be installed prior to ACS's <br /> mobilization. In the event the EC is not ready,a remobilization fee will be assessed to the project for each premature mobilization-RR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.