i
<br /> ' ZEPHYRHILLS FIRE DEPARTMENT
<br /> 38410 6th Ave Zephyrhills, FL 33542
<br /> FIRE-`SERVICE USER FEES increase 1/1/2018
<br /> Occupancy No.:N Plan o_: Contractor: C—S p�'
<br /> Business Name: lr & a Billing Address:
<br /> Business Address:
<br /> Business Phone'.No.: BillingPhone No.:
<br /> Business Fax No.: Billing Fax No.:
<br /> Contact:' Contact:
<br /> PLAN REVIEW FEES INSPECTION FEES PERMIT FEE
<br /> Annual-
<br /> Education,healtheare,De
<br /> tention&Correctional Public
<br /> Assembly,Business, schools,
<br /> Storage,Mercantile and -Churches
<br /> Site Plan N/C Industrial. no charge Sprinkler $50
<br /> `Multi-Family/Commercial .03.sf up to 800 sq ft $ 24.00 Standpipes $50
<br /> (Minimum Charge$24.00 801-1,500 sq-ft $ 34.52 Fire Pump $50
<br /> 0'.Plan Revisions DBL. " 1',501-2,500 sq ft $ 60.02 Hoods $50
<br /> 2,501-3,500 sq ft $ 90.02 Fire Alarm $50
<br /> SPRINKLER SYSTEMS 3,501-5,000 sq ft $ 127.52 LP Gas $50
<br /> �0-25-Heads $50, 5;501-7,500:sq ft $ .187.52 •Natural Gas $50
<br /> ;26.,plus',Heads $100 7,501-10,'000 sq ft $ 262.52 Fuel7anks- pertank $50
<br /> STANDPIPE.SYSTEM 10,001A5,000 sq ft $ 375.02 Sparklers $100
<br /> 13 Per Riser $50 15,001-20,000 sq ft $ 525.02 Fire'Works $500
<br /> FIRE'PUMP 20,001-30,000 sq ft $ 750.02 Camp Fire(recreation; $25
<br /> Per Pump $100 30,001-40,000 sq ft $ 1,050.02 Controlled Bum(15da; $100
<br /> FIRE ALARM SYSTEM 40,001=60,000 sq ft $ 1,500.02 -77 676 Hood/Duct $50
<br /> 0-25-Devices $50 60,001-80,000 sq ft $ 2,100.02 S� Place of Assembly $50 Annual
<br /> 80,001-($2,100.02)per
<br /> 26.plus,Devices $100 ea add T,000sq ft $ 0.06 Fire Protection $25
<br /> S.U,PPRESSIOW-SYSTEMS ' ;(Business'close&until Flammable Application $50 Annual
<br /> -Wet. $50 ''ti lolations corrected) Waste.Tire.Storage $50 Annual
<br /> Dry $50 ::SPRINKLER SYSTEMS Generator<KW $100
<br /> CO2 $50. rHydro Undergrounds $45 Generator>30 KW $100
<br /> Other $5tT `Hydrostatic Test $65 per system Bio-Hazard•Waste $100 Annual
<br /> KITCHEN EXHAUST Acceptance-Test $45 per system Fumigation Tenting $50
<br /> Hood/Ducts $50 Hydrant'Flow $75 Torch.PottApplied $50
<br /> .OTHER Haz.Materials $50 Annual
<br /> 8 LP Installatlon.perrtank $50 FIRE ALARM SYSTEM
<br /> Fuel Tank_,.Installation .$50.; System-Acceptance $50
<br /> (Per'Tank)� $5 l Recall Acceptance $50
<br /> Natural=Gas Installation $50 OTHER
<br /> (Per:Systehi) ,,'N Wall/smoke Wall $15 perwau
<br /> Spray.Booth $50 ;LP Gas $25 per tank
<br /> iNatural Gas $25 per system
<br /> eint.10'x10'or greater $15 per tent
<br /> .Fire Pump $45
<br /> 'Fire Suppression $30
<br /> System Acceptance
<br /> •,exhaust Hood/Duct $30
<br /> Re-Inspection DBL
<br /> (other than annual)
<br /> Inspection scheduled DBL
<br /> and cancelled less than
<br /> 24 hours
<br /> Construction Insp. N/C
<br /> Emergency Vehicle Acce $50
<br /> ioo.o-
<br /> PLANS;TOTAL S� INSPECTION TOTAL p PERMIT TOTAL©
<br /> GRAND TOTAL JAwQ1_ .OQ
<br /> Comments: O 74
<br /> Date: aoa-0 ..Inspector:
<br /> see.back
<br /> An
<br /> ^`1#'a:�;^•�.�. ,!yS;:'L^�'£�.��?�+;'7.': 2as' xsnavn.car^M�:ax�aa�'r.�`x.-.sh^x=sr!year-ra�nx�,.w:Wsc+•.,rm.a.a-a+:perea-�earx-.,szxtsvcsse�.n+�*+�vs,,,...-»,.-�.n.«»,..�.......„.......,.............-....-....-..-.....
<br />
|