Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.pipe insulation. <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping V. inch (19.1 mm) and larger in.nominal diameter. <br /> Piping serving more than one dwelling unit: <br /> Piping located outside the conditioned space.m Piping fro the water heater to.a distribution manifold: <br /> Piping.located under a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems_. <br /> 25.Blower door test shall be provided before C.O. <br /> 26.A copy of the enerzy cacls-shall be-with Perm. <br /> it at all times <br /> 2Z. Copu offtitat insulation report shall be provided with permit before final <br /> 28. No fence, pool or enclosure :is issued_with:this permit: <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />