Laserfiche WebLink
23..Tamper. Resistant Receptacles in accordance with 406.-11 ofthe 2016 N.-E.0 <br /> 24. In accordance'with the Land Development Code,lois.shall.be sodded before final at,least:10, <br /> feet around the structure'. <br /> 25. R403.5.3Hot.water,pipe insulation. <br /> Insulation for hot.water. pipe.with'a minimum thermal resistance (R-value) of R-3.shall.be applied to the <br /> following-, <br /> Piping 4:inch(19.1 mm)and larger in nominal diameter._ <br /> Pipinq serving more than one dwelling'.unit.' <br /> Piping located outside the conditioned space. <br /> Piping from the:water heater to a:distribution manifold., <br /> Piping.located under a floor slab: <br /> Buried in piping. . <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be prodded before CO <br /> 26.A cop of the energy cacls shall be with permit at all times <br /> 27.. Copy of flinatinsulution report shall be provided with permit before 1nax <br /> 28. No fence,pool onscreen enclosure''is-issued with ahis permit <br /> RRE:-Finished Floor'Elevation <br /> F.B.C-Florida Building Code Oh Edition <br /> R.O.W.-Right of Way <br /> A.D:A.=Americans with Disabilities.Act : N.E.C.-National Electric Code(2016) <br />